Lab Records
From Hall A Wiki
Contents
TODO List
- Clean and organize target lab
- Around He3 Cell
- Oven positioning
- Holding field hardware
- Air flow test
- Heater test
- Setup RTD reader
- Setup spectrometer
- Install He3 cell
- Install target chamber pickup coils
- Attach RTDs
- Laser Subsystem
- Cleaning optics stuff
- Q-wave plate calibration
- Install optics
- low power alignment
- High power check
- Optical Pumping Operational
- NMR Polarimetery
- NMR RF Delivery
- Pumping chamber pick up coil setup
- Target chamber pick up coil setup
- pick up coil alignment
- NMR code
- NMR Operational
- water NMR
- EPR Polarimetery
- EPR RF Delivery
- D2 light collection
- EPR code
- EPR line shape
- EPR frequency lock
- EPR Operational
Cell Installed, Arp 04, 2010
- Name: Boris
Oven Test
Heater Test
Oven is tested on Mar 24, 2010 without cell. Gas flow is 5~6 in mechanical meter, 508 on digital meter.
- If turn on the constant heater only (set temperature -> 20C), heater temp reached 212C, oven reached 154C
Air Flow meter Calibration @ Mar 9, 2010
Air flow meter in oven control chassis is cross calibrated with mechanical air flow meter at target.
Mechanical Flow Meter | Digital Flow Meter |
---|---|
1 | 260 |
3 | 390 |
5 | 490 |
7 | 600 |
Alarm 4 is set at 280.