December 17th 2021
From Hall A Wiki
- Updates
- HCal
- Hodoscope
- BB Calorimeter
- HV in start of run
- need to check if HV in CODA file, Alex will check and give event type if in CODA file
- BB Calorimeter
- GRINCH
- CDet
- GEM Bigbite
- GEM working
- GEM INFN clean room
- Helicity
- GEN RP
- beamline
- looking at BCM analysis
- working on putting helicity in tree, implemented but getting 0 so far so need to debug
- HV
- On-going tasks
- EPICS / start End of run logging script (fixed Bob 100% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - could try run ER and EB on same node - way to restart ET ?
- Carl looking at issues still unresolved - ER and ET communication - code updated - might fix issues - could try to update emu and ET to test
- EPICS / start End of run logging script (fixed Bob 100% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - could try run ER and EB on same node - way to restart ET ?
- (fixed database issue 100% working ) David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
- script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work - ( event count aligned, timestamp look odd maybe will check with Andrew )
- sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available
- reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add
separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark )
- Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch
- event type decoding in analyzer - ( done 100% ) - need update CH analyzer
- Possible new tasks
- User event inserted at each split with timestamp, spectrometer information - should discuss with
- setup laptop for CH blujeans and Slack - need fix hard drive
- Possible new tasks
- filling up google sheet with run info
- Unresolved issue
- (need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
- (still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
- HV can put documentation for other non EPICS control
- (50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
- (cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
- No clear signal in GRINCH - latency was adjusted - need check with beam ( see signal now ) - Event display
- adjust LED timing to match physics event -
- 3820 scalers : issue to address - will get more as spare - and need -
- 75 ns timing shift
- ( new) DAQ running with APV and MPD in bad state
GEn RP
- GEN RP DAQ
- To do list during break
- Must
- timing diagram, diagnostic time shift
- fix bad APVs
- HV network boot
- cosmics for HCAL -
- Must
- Like
- VETROC HCAL
- Shower FADC trigger
- HCAL FADC trigger
- Like