Monday, December 8: OWL Shift

From Hall A Wiki
Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
    • Note that ion chamber calibrations have ALREADY been done for: carbon (single foil), carbon (five-foil), and LH2. See this log entry. The limits on the ion chambers for these targets were set up for currents up to 20 uA.
  • Instructions for this shift
    • Take elastic calibration data. See this link. Experimental conditions: LH2 target, 5 uA, no raster
    • If there is time left in the shift ask MCC to do an ion chamber calibration for the 15 cm Dummy target.