Monday, December 8: OWL Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- Note that ion chamber calibrations have ALREADY been done for: carbon (single foil), carbon (five-foil), and LH2. See this log entry. The limits on the ion chambers for these targets were set up for currents up to 20 uA.
- Instructions for this shift
- Take elastic calibration data. See this link. Experimental conditions: LH2 target, 5 uA, no raster
- If there is time left in the shift ask MCC to do an ion chamber calibration for the 15 cm Dummy target.