Right HRS Quad Tuning Plan
From Hall A Wiki
- Right-HRS Kinematics: 1st Pass (Ebeam = 2.2 GeV)
Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Q2 [GeV2] | W [GeV] | Rate [Hz] at 20 μA | minutes for 71k events at 20 μA |
2.217 | 0.85 | 48.75 | 1.28 | 1.47 | 119 | 10 |
We want to take runs with the following Q1 currents:
- 0%: 173.825 A
- -10%: 156.443 A
- -5%: 165.134 A
- -2%: 170.349 A
- +2%: 177.302 A
- +5%: 182.516 A
- +10%: 191.208 A