Wednesday, April 29: SWING Shift

From Hall A Wiki
Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Luke Myers is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).

Delta Scans

    • Note: Keep an eye on the white board in CC more detail
  • Detailed instructions here

Harp Check

  • Ask MCC to run the four harps in the ARC (these are named 1C07A, 1C07B and 1C18A, 1C18B)
    • Current should be limited to 5 uA for this test
  • Make sure that each harp scan shows three clear peaks