E04-007
From Hall A Wiki
E04-007 (Successfully run in April-May 2008)
Below are the original links from the Main_Page. They may have changed since the run.
- Electroproduction of Pi0 near threshold Homepage
- Shift Schedule/Signup Page
- HOWTO Wiki
- BigBite DAQ Wiki
- BigBiteLib Introduction
- Hall A Homepage
- Hall A LOGbook (HALOG)
- Runlist
- MySQL Run Database
- Target information for Pi0 near threshold experiment
- BigBite High Voltage Control
- Contact numbers
- How to look at pi0 data
- Replay hints for BigBite
- Holey target and spot