August 24th 2022
From Hall A Wiki
Revision as of 08:27, 24 August 2022 by Camsonne (Talk | contribs) (Created page with "*Updates **HCAL ***taking overnight runs ***adjusting delay on trigger, and latency ***40 bins 160 ns ***delay for trigger adjusted *CDet **Magnetic shield test **finishing ef...")
- Updates
- HCAL
- taking overnight runs
- adjusting delay on trigger, and latency
- 40 bins 160 ns
- delay for trigger adjusted
- HCAL
- CDet
- Magnetic shield test
- finishing efficiency analysis
- VXS crate
- need give hostnae cdet crate to Bryan
- GEM
- SBS setup - finished - issue taking long runs - MPD firmware had to
- taking cosmics but issue with scintillators : 3 out of 6 scintillators were working, but issue fixed - had to increase voltage by 50 V - maybe because of HV modules - cables.
- will take cosmics during night time
- can try to integrate into full DAQ - need a copy cosmics - need to plug TS to TI
- pedestal width same as in EEL
- SBS magnet off : some electrons in GEM, for adjusting timing -
- BB cabling for trigger and clock : ribbon cable on V1495 was disconnnected
- hodoscope
- swapped HV : EPICS looks ok
- one good cosmic run
- data looks fine
- hodoscope ready to go
- Helicity : toolset for shift crew - need to know how often to start run for feebdack
- delayed helicity ? Can check if can do in time - last time