Difference between revisions of "BBCAL Documents"

From Hall A Wiki
Jump to: navigation, search
(2 intermediate revisions by the same user not shown)
Line 22: Line 22:
 
*Trigger Monitor Patch panels at Weldment and Front End  [[Media:Trigger_monitor_patch_panel.pdf| (pdf)]]
 
*Trigger Monitor Patch panels at Weldment and Front End  [[Media:Trigger_monitor_patch_panel.pdf| (pdf)]]
 
*NIM to ECL units for trigger monitor[[Media:NIM_TO_ECL.pdf| (pdf)]]
 
*NIM to ECL units for trigger monitor[[Media:NIM_TO_ECL.pdf| (pdf)]]
 +
 +
==DAQ==
 +
*FADC Addresses [[Media:Fadc_addresses.png| (png)]]
 +
** The position of the word matches the position of the switch, if the VME connector is on the right.

Revision as of 18:53, 22 July 2021

return to SBS wiki

BBCal Software

BigBite How-to

Adjusting High Voltage using GUI [‎pdf]

Cable Layout in the Hall

Cable Mapping at Weldment

High Voltage Mapping

Trigger Monitor

  • Trigger Monitor Patch panels at Weldment and Front End (pdf)
  • NIM to ECL units for trigger monitor (pdf)

DAQ

  • FADC Addresses (png)
    • The position of the word matches the position of the switch, if the VME connector is on the right.