Difference between revisions of "BBCAL Documents"

From Hall A Wiki
Jump to: navigation, search
Line 11: Line 11:
  
 
==Cable Mapping at Front End==
 
==Cable Mapping at Front End==
*BBCAL mapping at front end patch panels [[https://userweb.jlab.org/~efuchey/SBS_BB/CablingMaps/Shower500nsCablesMap.pdf| link]]
+
*BBCAL mapping at front end patch panels [[https://userweb.jlab.org/~efuchey/SBS_BB/CablingMaps/Shower500nsCablesMap.pdf link]]
*BBCAL mapping at front end summer modules [[https://userweb.jlab.org/~efuchey/SBS_BB/CablingMaps/BBlogicCablesMap.pdf| link]]
+
*BBCAL mapping at front end summer modules [[https://userweb.jlab.org/~efuchey/SBS_BB/CablingMaps/BBlogicCablesMap.pdf link]]
  
 
==Cable Mapping at Weldment ==
 
==Cable Mapping at Weldment ==

Revision as of 21:51, 13 August 2021

return to SBS wiki

BBCal Software

BigBite How-to

Adjusting High Voltage using GUI [‎pdf]

Cable Layout in the Hall


Cable Mapping at Front End

  • BBCAL mapping at front end patch panels [link]
  • BBCAL mapping at front end summer modules [link]

Cable Mapping at Weldment

High Voltage Mapping

Trigger Monitor

  • Trigger Monitor Patch panels at Weldment and Front End (pdf)
  • NIM to ECL units for trigger monitor (pdf)

DAQ

  • FADC Addresses (png)
    • The position of the word matches the position of the switch, if the VME connector is on the right.