Difference between revisions of "BigBite GRINCH"

From Hall A Wiki
Jump to: navigation, search
m (Mirror)
m (Design)
Line 37: Line 37:
 
*[[Mirror CAD]] -- 11/08/2013 (including clean room drawing)
 
*[[Mirror CAD]] -- 11/08/2013 (including clean room drawing)
 
*[[PMT Array Box CAD]] -- 01/23/2014
 
*[[PMT Array Box CAD]] -- 01/23/2014
*[https://hallaweb.jlab.org/wiki/images/9/9b/GRINCH_Main_Box_Assy_final_dwgs-compressed.pdf GRINCH Final Assembly Drawings] -- 08/04/2018 [[File:Blinking new.gif]]
+
*[https://hallaweb.jlab.org/wiki/images/9/9b/GRINCH_Main_Box_Assy_final_dwgs-compressed.pdf GRINCH Final Assembly Drawings] -- 08/04/2018
  
 
=== Gas ===
 
=== Gas ===

Revision as of 20:25, 29 December 2020

GRINCH Presentations

GRINCH Documentation (file uploads and cleanup in progress)

Background

Design

Gas

According to figure on page 4, <math> ABS_L=7424.75cm </math>

<math> I=I_0 e^{\lambda/ABS_L} </math>

Mirror

PMT

Geant4 Simulation

svn checkout svn+ssh://username@wm-jlab.physics.wm.edu/home/username/SVN/SVN

Prototype Gas Cherenkov Detector

DAQ for Prototype

RUN INFO

Prototype Run Information READ ONLY: guest/guest (broken)

GRINCH ASSEMBLY Blinking new.gif

TO DO LIST

  • Test CODA 3, check cables
  • Replace door gasket, seal door
  • Leak check, rate measurement
  • PMT gain matching

CONTACTS

  • Todd Averett: tdaver@jlab.org
  • Bradley Yale: byale@jlab.org