Difference between revisions of "Calorimeters Documentation"

From Hall A Wiki
Jump to: navigation, search
(Calorimeter Work Log)
(Calorimeter Work Log)
Line 15: Line 15:
 
  (06.28.22 Seeds) Notified Calorimeter folks (P. Datta, A. Tadepalli, J. Poudel, S. Barcus)
 
  (06.28.22 Seeds) Notified Calorimeter folks (P. Datta, A. Tadepalli, J. Poudel, S. Barcus)
  
  (06.29.22 Seeds) Entered hall, checked detector, turned on HV. Ran two CODA configs to test functionality for Alex Camsonne (GMN1hcalvtp and HCALVTP_TS). Both configs hang on ER1 after download on data collection ("waiting for ... ER1"). Ran CODA from adaq@adaq2 vnc :4. Notified Alex on Slack with screenshots.
+
  (06.29.22 Seeds) Entered hall, HCal visual check, turned on HV. Ran two CODA configs to test functionality for Alex Camsonne (GMN1hcalvtp and HCALVTP_TS). Both configs hang on ER1 after download on data collection ("waiting for ... ER1"). Ran CODA from adaq@adaq2 vnc :4. Notified Alex on Slack with screenshots.

Revision as of 15:06, 29 June 2022

Calorimeter Work Log

This is a wiki page dedicated to recording work done to the BBCal or HCal subsystem hardware or software. This log is expected to be temporary pending the creation of an elog.

Instructions for BBCal and HCal can be found here.

Documentation for BBCal and HCal can be found here.

---

(06.28.22 Seeds) Created Log. Will follow up with Steve Wood after he returns from vacation (3 weeks) to create the proper 
HCal/BBCal/ECal elog.
(Seeds) Sample reply
(06.28.22 Seeds) Notified Calorimeter folks (P. Datta, A. Tadepalli, J. Poudel, S. Barcus)
(06.29.22 Seeds) Entered hall, HCal visual check, turned on HV. Ran two CODA configs to test functionality for Alex Camsonne (GMN1hcalvtp and HCALVTP_TS). Both configs hang on ER1 after download on data collection ("waiting for ... ER1"). Ran CODA from adaq@adaq2 vnc :4. Notified Alex on Slack with screenshots.