December 11th 2020
From Hall A Wiki
- HCAL
- Voltage scan with different LED, everything looks ok
- DVCS pulser
- BB GEM
- readout list and library setup, configuration files need to be done
- UVA chamber only * start cabling * Holly will get the DAQ working * INFN chamber will be installed later * seems cabling UVA chamber will not interfere with INFN
- cabling need to be setup carefully since they are heavy
- one issue found by Bogdan in honeycomb frame * not rigid enough
- one MPD optical was not working
- get other MPDs from UVA
- trigger and clock box * need add NIM
- GEM INFN : no DAQ because of work
- formal request from EES for backplane and 110 APV and MPDs
- UVA GEM
- increase LV still to be done
- measured 3.5 V going in the regulator
- looking at also increasing size of cable
- Shower
- finished preshower and shower cabling
- set up cosmics with Fastbus * done taking cosmics
- update to CODA3 will proceed
- Hodoscope
- if gate set up, just software
- will use shower scintillator for trigger
- ADC and TDC
- HRS
- one crate with intel and pipeline TI board, have CODA config but need to try
- CDet
- collecting data at 5 different HV
- all data collecting by Monday or Tuesday
- noisy channel still present : ADC or filter card
- power cable for NINO cards will need to be double isolated
- make inventory