Difference between revisions of "Docs"
From Hall A Wiki
(→General Documents) |
(→Mapping Documents) |
||
(17 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
*BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[https://hallaweb.jlab.org/wiki/images/f/fb/BB-Hodo-technical-specs.pdf]] | *BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[https://hallaweb.jlab.org/wiki/images/f/fb/BB-Hodo-technical-specs.pdf]] | ||
*Software requirements, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/1/1e/BB_TH_Software_Requirements.pdf]] | *Software requirements, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/1/1e/BB_TH_Software_Requirements.pdf]] | ||
− | |||
*Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]] | *Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]] | ||
*Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/b/ba/Roughening_Glueing_May2020.pdf]] | *Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/b/ba/Roughening_Glueing_May2020.pdf]] | ||
+ | |||
+ | ===How to Documents=== | ||
+ | *High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, J. Annand et al. [[https://hallaweb.jlab.org/wiki/images/e/e0/BBelect.17.07.19.pdf]] | ||
===Mapping Documents=== | ===Mapping Documents=== | ||
− | *Updated mapping for cosmics running 2021 '''currently in preparation''' | + | *Updated complete mapping for cosmics running 2021 '''currently in preparation''' |
− | * | + | *Cosmics channel mapping (R. Marinaro, 2021 during cosmic commissioning) [[https://hallaweb.jlab.org/wiki/images/0/0c/BB_HODO_Channel_Map.pdf]] |
− | * | + | *Cosmics high voltage and low voltage mapping overview (R. Montgomery, February 2020) [[https://hallaweb.jlab.org/wiki/images/8/8f/HodoMapping_Feb2020_lowres.pdf]] |
+ | *Cosmics mapping spreadsheet document, take note there are 3 tabs in the spreadsheet. This mapping misses only signal cables from frame to weldment (R. Montgomery, Feb 2020). [[https://hallaweb.jlab.org/wiki/images/a/ad/HodoMapping_Feb2020.xlsx]] | ||
===Schematics=== | ===Schematics=== | ||
*HV patch panels, J. Annand, A. Clarkson [[https://hallaweb.jlab.org/wiki/images/2/24/HVpanel.pdf]] | *HV patch panels, J. Annand, A. Clarkson [[https://hallaweb.jlab.org/wiki/images/2/24/HVpanel.pdf]] | ||
− | *Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document | + | *Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document [[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]] |
− | *Schematic for PMT bases is found in figure 3 of "Original electronics plan" document | + | *Schematic for PMT bases is found in figure 3 of "Original electronics plan" document [[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]] |
− | *Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document | + | *Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document [[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]] |
===Manuals/Spec sheets for components of hodoscope=== | ===Manuals/Spec sheets for components of hodoscope=== | ||
Line 26: | Line 29: | ||
*CAEN V1190 [[https://hallaweb.jlab.org/wiki/images/2/21/V1190_REV14.pdf]] | *CAEN V1190 [[https://hallaweb.jlab.org/wiki/images/2/21/V1190_REV14.pdf]] | ||
*CAEN SY1527LC HV mainframe, 19" wide, 8U [[https://hallaweb.jlab.org/wiki/images/5/58/Sy1527usermanual_rev18.pdf]] | *CAEN SY1527LC HV mainframe, 19" wide, 8U [[https://hallaweb.jlab.org/wiki/images/5/58/Sy1527usermanual_rev18.pdf]] | ||
− | *Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe - | + | *Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe [[https://hallaweb.jlab.org/wiki/images/5/55/A1932a_rev9-3.pdf]] |
− | *Accessory CAEN A1531 primary PSU for HV mainframe - no manual online | + | *Accessory CAEN A1531 primary PSU for HV mainframe - no specific manual online, contacted CAEN and they refer to this document [[https://hallaweb.jlab.org/wiki/images/9/92/Hwguide_rev3.pdf]] |
*AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[https://hallaweb.jlab.org/wiki/images/1/17/N5700usr-2.pdf]] | *AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[https://hallaweb.jlab.org/wiki/images/1/17/N5700usr-2.pdf]] | ||
*Wiener 6U VME64x 6023 crate [[https://hallaweb.jlab.org/wiki/images/c/cd/6U_VME64x_6023_Full_Size_Chassis_-_VME64-x.pdf]] | *Wiener 6U VME64x 6023 crate [[https://hallaweb.jlab.org/wiki/images/c/cd/6U_VME64x_6023_Full_Size_Chassis_-_VME64-x.pdf]] |
Latest revision as of 12:10, 26 March 2021
Contents
General Documents
- BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[1]]
- Software requirements, R. Montgomery et al. [[2]]
- Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[3]]
- Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[4]]
How to Documents
- High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, J. Annand et al. [[5]]
Mapping Documents
- Updated complete mapping for cosmics running 2021 currently in preparation
- Cosmics channel mapping (R. Marinaro, 2021 during cosmic commissioning) [[6]]
- Cosmics high voltage and low voltage mapping overview (R. Montgomery, February 2020) [[7]]
- Cosmics mapping spreadsheet document, take note there are 3 tabs in the spreadsheet. This mapping misses only signal cables from frame to weldment (R. Montgomery, Feb 2020). [[8]]
Schematics
- HV patch panels, J. Annand, A. Clarkson [[9]]
- Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document [[10]]
- Schematic for PMT bases is found in figure 3 of "Original electronics plan" document [[11]]
- Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document [[12]]
Manuals/Spec sheets for components of hodoscope
- Electron Tubes ET9124 SB type PMTs [[13]]
- Eljen Technology EJ200 scintillator bars [[14]]
- Eljen technology UVT acrylic light guides [[15]]
- DYMAX optical cure epoxy - check which specific model number was used in Jlab repairs
- Cage HV connectors at HV patch panel connections [[16]]
- CAEN V792 [[17]]
- CAEN V1190 [[18]]
- CAEN SY1527LC HV mainframe, 19" wide, 8U [[19]]
- Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe [[20]]
- Accessory CAEN A1531 primary PSU for HV mainframe - no specific manual online, contacted CAEN and they refer to this document [[21]]
- AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[22]]
- Wiener 6U VME64x 6023 crate [[23]]