Difference between revisions of "E12-17-004-ERR-29May2019"
From Hall A Wiki
(→Agenda) |
|||
Line 42: | Line 42: | ||
* [[Media:E12-17-004_RSAD.pdf|E12-17-004 Radiation Safety Assessment (RSAD)]] | * [[Media:E12-17-004_RSAD.pdf|E12-17-004 Radiation Safety Assessment (RSAD)]] | ||
'''NOTE:''' The COO, ESAD, ERG, SBS OSPs, etc from GMn (E12-09-019) will cover E12-17-004 as well. GEM, hodoscope, and neutron analyzer controls are identical. ''No hardware with unique characteristics is being added to the system''. | '''NOTE:''' The COO, ESAD, ERG, SBS OSPs, etc from GMn (E12-09-019) will cover E12-17-004 as well. GEM, hodoscope, and neutron analyzer controls are identical. ''No hardware with unique characteristics is being added to the system''. | ||
+ | |||
+ | = GMn Reviews / Information = | ||
+ | * [https://hallaweb.jlab.org/12GeV/SuperBigBite/meetings/rev_30oct2018/index.html GMn and GEn Polarimetry Hall A Preparation Review Oct 2018] | ||
+ | * [[SBS_2017_GMn_Experimental_Readiness_Review|SBS 2017 GMn Experimental Readiness Review]] |
Revision as of 08:07, 29 May 2019
Contents
E12-17-004 Experimental Readiness Review 2019 (Hall A)
Time and Location
- Date: May 29, 2019
- Location: CEBAF Center Room L102
- ERR Charge: ERR Charge
- ERR Committee: Howard Fenker (chair), Lubomir Pentchev, Chris Cuevas, Pavel Degtiarenko, Bert Manzlak, Ed Folts (observer), Javier Gomez (observer)
Bluejeans Connection Meeting ID: 994 840 800 Meeting URL: https://bluejeans.com/994840800 Phone Dial-in: +1.888.240.2560 (US Toll Free) Global Numbers: https://www.bluejeans.com/premium-numbers
Agenda
- 08:00 (25) Executive Session
- 08:25 (5) Remarks from Chair and Charge
- 08:30 (30+10) Charge Items 1, 2(bde), 5—8: Overview, equipment, ownership, schedule, etc (pdf) -- Brad Sawatzky
- New equipment (beyond those in common with E12-09-019)
- Apparatus ownership, maintenance and control, safety documentation and procedures
- Completion/commissioning schedule and tasks for new equipment
- Impact and integration with E12-09-019 run plan
- New equipment (beyond those in common with E12-09-019)
- 9:10 (20+10) Charge Item 2c: Mechanical design, engineering (ppt)-- Robin Wines
- 9:40 (20+10) Charge Item 2a, 6: GEMs and associated electronics (pdf) -- Kondo Gnanvo
- 10:10 ~ Coffee Break ~
- 10:30 (20+10) Charge Item 2(bd), 3b: Neutron polarimetry details (Ch. Ex & Proton recoil) (pdf)-- David Hamilton
- 11:00 (20+10) Charge Item 3a, 4: Simulation, analysis software and publication timeline (pdf) -- Will Tireman
- 11:30 Discussion as needed
- 12:00 ~ Lunch ~
- 13:00 Executive Session
- 15:00 Close Out
Document Drafts
NOTE: The COO, ESAD, ERG, SBS OSPs, etc from GMn (E12-09-019) will cover E12-17-004 as well. GEM, hodoscope, and neutron analyzer controls are identical. No hardware with unique characteristics is being added to the system.