Difference between revisions of "Friday, June 8, 2018 2PM ET"

From Hall A Wiki
Jump to: navigation, search
(New page: Previous meeting: Friday, May 25, 2018 2PM ET Media:KK's MOLLER Task List.pdf ===Task List Summary=== * Simulation tasks [https://hallaweb.jlab.org/wiki/images/5/58/MOLLER_TasksL...)
 
Line 11: Line 11:
 
==Agenda==
 
==Agenda==
 
* Simulation coding updates
 
* Simulation coding updates
* Shielding update  
+
** Daniel and Audrey are adding generators for specific upcoming SBU simulation tasks
 +
** Designing a function-defined radial position at downstream detector generator
 +
** Also improving the "external" root output file -> input file generator
 +
* Shielding update
 +
** Getting the newest version of remoll (v2.0.0 -> Master) to work with all geometries
 +
** Updating analysis scripts to use the new data structures
 
* Air/Vacuum Study
 
* Air/Vacuum Study
 +
** Waiting for the geometry definition in the radiation shielding to be verified by Cameron and Chandan to make a new, more comprehensive set of Air/Vacuum/Helium test geometries
  
 
==Attendance:==
 
==Attendance:==

Revision as of 12:49, 8 June 2018

Previous meeting: Friday, May 25, 2018 2PM ET

Media:KK's MOLLER Task List.pdf

Task List Summary


Agenda

  • Simulation coding updates
    • Daniel and Audrey are adding generators for specific upcoming SBU simulation tasks
    • Designing a function-defined radial position at downstream detector generator
    • Also improving the "external" root output file -> input file generator
  • Shielding update
    • Getting the newest version of remoll (v2.0.0 -> Master) to work with all geometries
    • Updating analysis scripts to use the new data structures
  • Air/Vacuum Study
    • Waiting for the geometry definition in the radiation shielding to be verified by Cameron and Chandan to make a new, more comprehensive set of Air/Vacuum/Helium test geometries

Attendance:

Attendance:

Minutes



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005