Difference between revisions of "Friday, May 11, 2018 2PM ET"

From Hall A Wiki
Jump to: navigation, search
(Attendance:)
(Minutes)
Line 20: Line 20:
  
 
Minutes:
 
Minutes:
*
+
* Modular geometry implementation using text files and scripts
 +
** Used in shielding optimization by Cameron
 +
** It's available in SBU git repository
 +
* Beam dump is implemented in the remoll
 +
* Cameron is looking at the sky shine from the apparatus and the beam dump see simulation elog 34 for plots
 +
** currently shielding and beam dump background is separated to reduce the simulation time.
 +
* Finalize the shielding by July and August then obtain Photon background in the detector plane
 +
* Generate estimate on sky-shine with current shielding (PREX style estimate)
 +
** Then we run it with Pavel to get his estimate
 +
* Then get feedback from Engineers on the shielding design
 +
* Waiting on engineers for the beam-line update then we can implement it on simulation
 +
 
 +
*
 +
 
  
  

Revision as of 13:23, 11 May 2018

Previous meeting: Friday, April 27, 2018 2PM ET

Media:KK's MOLLER Task List.pdf

Task List Summary


Agenda

  • Simulation concerns
  • Beamline backgorund
  • Air/Vacuum Study: slides

Attendance:

Attendance: Rakitha, Sakib, Chandan, KK, Ciprian, Kent, Dustin,

Minutes

Minutes:

  • Modular geometry implementation using text files and scripts
    • Used in shielding optimization by Cameron
    • It's available in SBU git repository
  • Beam dump is implemented in the remoll
  • Cameron is looking at the sky shine from the apparatus and the beam dump see simulation elog 34 for plots
    • currently shielding and beam dump background is separated to reduce the simulation time.
  • Finalize the shielding by July and August then obtain Photon background in the detector plane
  • Generate estimate on sky-shine with current shielding (PREX style estimate)
    • Then we run it with Pavel to get his estimate
  • Then get feedback from Engineers on the shielding design
  • Waiting on engineers for the beam-line update then we can implement it on simulation





Return to Teleconferences
Return to MOLLER at 11 GeV E09-005