Difference between revisions of "Gep5"
From Hall A Wiki
(→BiWeekly meeting) |
(→BiWeekly meeting) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
[[category:SBSinfo]] | [[category:SBSinfo]] | ||
== BiWeekly meeting == | == BiWeekly meeting == | ||
− | The next biweekly meeting will be | + | The next biweekly meeting will be Monday Sept 9th at 11:00 in B101 |
− | + | ||
*Agenda of Tues June 18th meeting: | *Agenda of Tues June 18th meeting: | ||
** Ed Brash presented slide on SLAC tests | ** Ed Brash presented slide on SLAC tests | ||
[[Image:SLAC_summary_test.pdf]] | [[Image:SLAC_summary_test.pdf]] | ||
+ | |||
+ | *Agenda of Tues July 2nd meeting: | ||
+ | ** [https://hallaweb.jlab.org/wiki/images/7/7f/Energy_Sum_%26_Resolution_%287-2-2013%29.pdf Presentation] by Matthew Burton on progress on energy calibration. | ||
+ | ** Small description of the Shakslik modules Geant4 simulation design. Carlos Ayerbe | ||
+ | |||
+ | *Agenda of Tues July 29th meeting: | ||
+ | ** Final Results of energy resolution analysis by Matthew Burton | ||
== Links == | == Links == |
Latest revision as of 10:39, 3 September 2013
GEp5 experiment
Contents
BiWeekly meeting
The next biweekly meeting will be Monday Sept 9th at 11:00 in B101
- Agenda of Tues June 18th meeting:
- Ed Brash presented slide on SLAC tests
- Agenda of Tues July 2nd meeting:
- Presentation by Matthew Burton on progress on energy calibration.
- Small description of the Shakslik modules Geant4 simulation design. Carlos Ayerbe
- Agenda of Tues July 29th meeting:
- Final Results of energy resolution analysis by Matthew Burton
Links
- Minutes of SBS Wed meetings.
Talks
- Talk at Hall A 2009 Winter meeting.
- Talk on calorimeters for SBS January 2010 Technical Review.
- Talk at SBS March 2010 meeting.
- Talk at SBS March 2010 meeting.
- Talk Charles's talk on Newcal geometry and trigger on 6/21/12.
Response to Technical Review
Magnet and Setup
- Slides on the coils and magnetic fields of SBS magnet.
- Slides of SBS and detector setup for GMn, GEn and GEp (pages 19-21) experiments.
- Opening of the SBS magnet is 18.5" wide x 48" tall x 48" long.
- Plots of the Q2 distribution as function of x and y at the calorimeter ( located at 16.9 deg and 5.26m) with cuts on SBS detectors.
- Plots of the Q2 distribution as function of x and y at the SBS detectors (x12,y12 are the last GEM in front tracker) (x22,y22 is last GEM in the 2nd tracker) (x32,y32 is last GEM in the 3rd tracker) (xm,ym is at exit of SBS magnet).
- Slides of presentation by Carlos about the TOY MC on Aug 9th 2012.
- Kinematic Settings