Remove three Oxford power supplies from HMS
 +
 +
HMS Q2 lead voltage drops
 +
 +
Heaters for SHMS magnet flags
 +
 
Heaters for HMS magnet flags
 
Heaters for HMS magnet flags
  
Release Right Shield House door controls from support and drop them down - tie back to platform legs
+
Replace the Lakeshore 450 gaussmeter for HMS Q1
  
Controls for corrector coils
+
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
 +
 
 +
Controls for SBS corrector coils
  
 
Re-tap the SBS supply main transformer for full power
 
Re-tap the SBS supply main transformer for full power
Line 16: Line 24:
  
 
clean up L-arm supply platform
 
clean up L-arm supply platform
 +
 +
Install new liquid level meters on SHMS
 +
 +
Remove actuators from right arm magnets
 +
 +
HMS supply control boxes into the Shield Hut
 +
 +
Gas mix controller for GEM detectors
 +
 +
Fix relay box for HMS counting room E-Stops

Latest revision as of 13:32, 11 June 2021

Remove three Oxford power supplies from HMS

HMS Q2 lead voltage drops

Heaters for SHMS magnet flags

Heaters for HMS magnet flags

Replace the Lakeshore 450 gaussmeter for HMS Q1

Help Brad re-configure the DAQ rack in Counting Room C - May 17-21

Controls for SBS corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Install new liquid level meters on SHMS

Remove actuators from right arm magnets

HMS supply control boxes into the Shield Hut

Gas mix controller for GEM detectors

Fix relay box for HMS counting room E-Stops