Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new one for SBS supply
 +
 +
Swap out MFCs in VDC mixing system
 +
 
Remove three Oxford power supplies from HMS
 
Remove three Oxford power supplies from HMS
  
HMS Q2 lead voltage drops
+
<s>HMS Q2 lead voltage drops</s> Done
  
Heaters for SHMS magnet flags
+
Heaters for SHMS magnet flags.
  
Heaters for HMS magnet flags
+
Hall A cooldown.
  
Replace the Lakeshore 450 gaussmeter for HMS Q1
+
Heaters for HMS magnet flags-Heaters-modifications to guards complete, heaters installed.  Waiting on controller.
  
Make replacement backup batteries for Hall C PLCs - install - install new UPS
+
Help Brad re-configure the DAQ rack in Counting Room C
  
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
+
Swap out CAEN HV crate in Counting Room C
  
 
Controls for SBS corrector coils
 
Controls for SBS corrector coils
Line 20: Line 24:
  
 
connect power and LCW to BB supply on R-arm platform
 
connect power and LCW to BB supply on R-arm platform
 +
 +
Replace air compressor in Hall A Gas Shed
  
 
re-locate displays for hacweb11 and 14
 
re-locate displays for hacweb11 and 14
Line 27: Line 33:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live.
  
Remove actuators from right arm magnets
+
Remove actuators from right arm magnets. (Dipole complete)
  
HMS supply control boxes into the Shield Hut
+
<s>HMS supply control boxes into the Shield Hut</s> Done
  
 
Gas mix controller for GEM detectors
 
Gas mix controller for GEM detectors
  
Fix relay box for HMS counting room E-Stops
+
<s>Fix relay box for HMS counting room E-Stops</s> Done
 +
 
 +
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
 +
 
 +
Readout for LCW pressure sensors added at end of beamline walkway
 +
 
 +
Remote reset for Hall C spectrometer motion
 +
 
 +
Install new quench protection boards in Hall A LD1
 +
 
 +
Reconnect Magnet On signs to the HMS supplies

Latest revision as of 18:05, 23 July 2021

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new one for SBS supply

Swap out MFCs in VDC mixing system

Remove three Oxford power supplies from HMS

HMS Q2 lead voltage drops Done

Heaters for SHMS magnet flags.

Hall A cooldown.

Heaters for HMS magnet flags-Heaters-modifications to guards complete, heaters installed. Waiting on controller.

Help Brad re-configure the DAQ rack in Counting Room C

Swap out CAEN HV crate in Counting Room C

Controls for SBS corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

Replace air compressor in Hall A Gas Shed

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live.

Remove actuators from right arm magnets. (Dipole complete)

HMS supply control boxes into the Shield Hut Done

Gas mix controller for GEM detectors

Fix relay box for HMS counting room E-Stops Done

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker

Readout for LCW pressure sensors added at end of beamline walkway

Remote reset for Hall C spectrometer motion

Install new quench protection boards in Hall A LD1

Reconnect Magnet On signs to the HMS supplies