Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new one for SBS supply
+
== Priority Items ==
  
Swap out MFCs in VDC mixing system
+
<s>Jumper bars for SBB coils </s> Done.
  
Remove three Oxford power supplies from HMS
+
<s>Controls for SBB and corrector coils (software updates and re-test)</s> Done.
  
HMS Q2 lead voltage drops
+
<s>Install magnet leads for SBB (535 MCM cable)</s> Done.
  
Heaters for SHMS magnet flags.
+
<s>Connect magnet leads for SBB corrector magnets </s> Done.
  
Hall A cooldown.
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Heaters for HMS magnet flags-Heaters-modifications to guards complete, heaters installed.  Waiting on controller.
+
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)
  
Help Brad re-configure the DAQ rack in Counting Room C
+
<s>Install thermistors on SBS/Big Bite magnets and junction boxes.</s> Done.
  
Swap out CAEN HV crate in Counting Room C
+
<s>Install Klixons on SBB.</s> Done.
  
Controls for SBS corrector coils
+
Mount Left Shield House temperature readout in CH
  
Re-tap the SBS supply main transformer for full power
+
Find video cables from hall in the CH
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
<s>Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough</s> Done.
  
connect power and LCW to BB supply on R-arm platform
+
== Would Be Good To Do Items ==
  
Replace air compressor in Hall A Gas Shed
+
<s>Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker</s> Done.
  
re-locate displays for hacweb11 and 14
+
<s>Test LQ2 FuG with new polarity reversal switch.</s> No longer needed.
 +
 
 +
Find and connect NMR cables in CH
 +
 
 +
Gas manifolds for GEM gas cylinders (started)
 +
 
 +
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
 +
 
 +
Gas mix controller and MFCs for GEM detectors (not started)
 +
 
 +
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
 +
 
 +
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 33: Line 45:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live.
+
Swap out MFCs in VDC mixing system
 +
 
 +
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
 +
 
 +
Calibrate and op-check spare warm return valves for Hall C.
 +
 
 +
== PARTS ORDER LIST FOR 1 OCT ==
  
Remove actuators from right arm magnets. (Dipole complete)
+
-2 wire cable,
 +
ferrules,
 +
\# 6 hardware
  
HMS supply control boxes into the Shield Hut
+
== Possible Future Items ==
  
Gas mix controller for GEM detectors
+
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
  
Fix relay box for HMS counting room E-Stops
+
Remote reset for Hall C spectrometer motion (maybe next year)
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Latest revision as of 14:11, 13 October 2021

Priority Items

Jumper bars for SBB coils Done.

Controls for SBB and corrector coils (software updates and re-test) Done.

Install magnet leads for SBB (535 MCM cable) Done.

Connect magnet leads for SBB corrector magnets Done.

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)

Install thermistors on SBS/Big Bite magnets and junction boxes. Done.

Install Klixons on SBB. Done.

Mount Left Shield House temperature readout in CH

Find video cables from hall in the CH

Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough Done.

Would Be Good To Do Items

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker Done.

Test LQ2 FuG with new polarity reversal switch. No longer needed.

Find and connect NMR cables in CH

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Swap out MFCs in VDC mixing system

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

PARTS ORDER LIST FOR 1 OCT

-2 wire cable, ferrules, \# 6 hardware

Possible Future Items

Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).