== Priority Items ==
 
== Priority Items ==
  
Hall A Moller Polarimeter target magnet re-install: helium recharge, compressor and chiller clean up and setup, testing (pumping down on cold head)
+
<s>Jumper bars for SBB coils </s> Done.
  
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller, fans installed, managing ice well.
+
<s>Controls for SBB and corrector coils (software updates and re-test)</s> Done.
  
<s>Heaters for HMS magnet flags-Heaters</s> Done. Monitoring to determine heater trip points.
+
<s>Install magnet leads for SBB (535 MCM cable)</s> Done.  
  
Install S0 counter above BB for a cosmics trigger.
+
<s>Connect magnet leads for SBB corrector magnets </s> Done.
  
Locking bar for the Right Shield House (have bar - needs two holes drilled)
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
+
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)
  
Jumper bars for SBB coils (copper bus bar ordered)
+
<s>Install thermistors on SBS/Big Bite magnets and junction boxes.</s> Done.
  
Controls for SBB and corrector coils (waiting for water to the magnets)
+
<s>Install Klixons on SBB.</s> Done.
  
Re-tap the SBB supply main transformer for full power (Joe will start after renewing his training)
+
Mount Left Shield House temperature readout in CH
  
Connect 480VAC for SBB and corrector power supplies (waiting on the electricians - ordered outlets and plugs)
+
Find video cables from hall in the CH
  
Ground power supplies and corrector supply racks in DAQ Bunker (not started)
+
<s>Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough</s> Done.
  
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)
+
== Would Be Good To Do Items ==
  
Install magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections, only three power supplies in rack)
+
<s>Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker</s> Done.
  
Connect SBB and corrector magnets to FSD (ADC is installed)(cables run/landed and verified, ch1 upstream left, ch2 upstream right, ch3 downstream left, ch4 downstream right, ch5 SBS)
+
<s>Test LQ2 FuG with new polarity reversal switch.</s> No longer needed.
  
Ground HCAL DAQ racks
+
Find and connect NMR cables in CH
 
+
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
 
+
connect LCW to BB supply on R-arm platform (not started)
+
 
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
+
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
Line 43: Line 37:
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
 
+
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (mostly done)
+
 
+
Install thermistors on SBS/Big Bite magnets and junction boxes. ADC node boards made and parts stuffing is ongoing.
+
 
+
Install Kilxons on SBS?
+
 
+
Install Klixons on Big Bite?
+
 
+
DSG SBS gas flow monitoring needs a driver and node. Node needs to be stuffed. RPis need a PDU.
+
 
+
Rpi for threshhold monitoring for DAQ
+
 
+
Gaussmeters for SBS and Big Bite?
+
 
+
== Would Be Good To Do Items ==
+
 
+
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
  
Remove actuators from right arm magnets. (Dipole complete)
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 71: Line 47:
 
Swap out MFCs in VDC mixing system
 
Swap out MFCs in VDC mixing system
  
Remove three Oxford power supplies from HMS
+
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
  
 +
Calibrate and op-check spare warm return valves for Hall C.
  
 +
== PARTS ORDER LIST FOR 1 OCT ==
 +
 +
-2 wire cable,
 +
ferrules,
 +
\# 6 hardware
  
 
== Possible Future Items ==
 
== Possible Future Items ==
Line 80: Line 62:
  
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Remote reset for Hall C spectrometer motion (maybe next year)
 +
 +
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Latest revision as of 14:11, 13 October 2021

Priority Items

Jumper bars for SBB coils Done.

Controls for SBB and corrector coils (software updates and re-test) Done.

Install magnet leads for SBB (535 MCM cable) Done.

Connect magnet leads for SBB corrector magnets Done.

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)

Install thermistors on SBS/Big Bite magnets and junction boxes. Done.

Install Klixons on SBB. Done.

Mount Left Shield House temperature readout in CH

Find video cables from hall in the CH

Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough Done.

Would Be Good To Do Items

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker Done.

Test LQ2 FuG with new polarity reversal switch. No longer needed.

Find and connect NMR cables in CH

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Swap out MFCs in VDC mixing system

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

PARTS ORDER LIST FOR 1 OCT

-2 wire cable, ferrules, \# 6 hardware

Possible Future Items

Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).