== Priority Items ==
 
== Priority Items ==
  
Hall A Moller Polarimeter target magnet testing (Simona's turn when she's ready, and any fixes afterward if necessary)
+
<s>Jumper bars for SBB coils </s> Done.
  
Install S0 counter above BB for a cosmics trigger.
+
<s>Controls for SBB and corrector coils (software updates and re-test)</s> Done.
  
Locking bar for the Right Shield House (have bar - needs two holes drilled)
+
<s>Install magnet leads for SBB (535 MCM cable)</s> Done.
  
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
+
<s>Connect magnet leads for SBB corrector magnets </s> Done.
  
Jumper bars for SBB coils (copper bus bar ordered)
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Controls for SBB and corrector coils (waiting for water to the magnets)
+
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)
  
Ground power supplies and corrector supply racks in DAQ Bunker (not started)
+
<s>Install thermistors on SBS/Big Bite magnets and junction boxes.</s> Done.
  
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)
+
<s>Install Klixons on SBB.</s> Done.
  
Install magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections)
+
Mount Left Shield House temperature readout in CH
  
Connect SBB and corrector magnets to FSD (ADC is installed)(cables run/landed and verified, ch1 upstream left, ch2 upstream right, ch3 downstream left, ch4 downstream right, ch5 SBS)
+
Find video cables from hall in the CH
  
Ground HCAL DAQ racks
+
<s>Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough</s> Done.
  
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
== Would Be Good To Do Items ==
  
connect LCW to BB supply on R-arm platform (not started)
+
<s>Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker</s> Done.
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
+
<s>Test LQ2 FuG with new polarity reversal switch.</s> No longer needed.
 +
 
 +
Find and connect NMR cables in CH
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
Line 35: Line 37:
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
 
+
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, needs tested)
+
 
+
Install thermistors on SBS/Big Bite magnets and junction boxes. ADC node boards made and parts stuffing is ongoing.
+
 
+
Install Kilxons on SBS?
+
 
+
DSG SBS gas flow monitoring needs a driver and node. Node needs to be stuffed. RPis need a PDU.
+
 
+
Rpi for threshhold monitoring for DAQ
+
 
+
== Would Be Good To Do Items ==
+
 
+
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
  
Remove actuators from right arm magnets. (Dipole complete)
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 58: Line 46:
  
 
Swap out MFCs in VDC mixing system
 
Swap out MFCs in VDC mixing system
 
Remove three Oxford power supplies from HMS
 
  
 
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
 
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
 +
 +
Calibrate and op-check spare warm return valves for Hall C.
 +
 +
== PARTS ORDER LIST FOR 1 OCT ==
 +
 +
-2 wire cable,
 +
ferrules,
 +
\# 6 hardware
  
 
== Possible Future Items ==
 
== Possible Future Items ==
Line 68: Line 62:
  
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Remote reset for Hall C spectrometer motion (maybe next year)
 +
 +
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Latest revision as of 14:11, 13 October 2021

Priority Items

Jumper bars for SBB coils Done.

Controls for SBB and corrector coils (software updates and re-test) Done.

Install magnet leads for SBB (535 MCM cable) Done.

Connect magnet leads for SBB corrector magnets Done.

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)

Install thermistors on SBS/Big Bite magnets and junction boxes. Done.

Install Klixons on SBB. Done.

Mount Left Shield House temperature readout in CH

Find video cables from hall in the CH

Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough Done.

Would Be Good To Do Items

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker Done.

Test LQ2 FuG with new polarity reversal switch. No longer needed.

Find and connect NMR cables in CH

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Swap out MFCs in VDC mixing system

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

PARTS ORDER LIST FOR 1 OCT

-2 wire cable, ferrules, \# 6 hardware

Possible Future Items

Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).