== Priority Items ==
 
== Priority Items ==
  
Hall A Moller Polarimeter target magnet testing (Simona's turn when she's ready, and any fixes afterward if necessary)
+
<s>Jumper bars for SBB coils </s> Done.
  
Install S0 counter above BB for a cosmics trigger.
+
<s>Controls for SBB and corrector coils (software updates and re-test)</s> Done.
  
Locking bar for the Right Shield House (needs to be installed and demonstrated it will keep door closed)
+
<s>Install magnet leads for SBB (535 MCM cable)</s> Done.
  
Jumper bars for SBB coils (in progress)
+
<s>Connect magnet leads for SBB corrector magnets </s> Done.
  
Controls for SBB and corrector coils (waiting for water to the magnets)
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)  
+
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)
  
Connect magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections)
+
<s>Install thermistors on SBS/Big Bite magnets and junction boxes.</s> Done.
  
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
<s>Install Klixons on SBB.</s> Done.
  
Gas manifolds for GEM gas cylinders (started)
+
Mount Left Shield House temperature readout in CH
  
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
+
Find video cables from hall in the CH
  
Gas mix controller and MFCs for GEM detectors (not started)
+
<s>Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough</s> Done.
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
== Would Be Good To Do Items ==
  
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, needs tested)
+
<s>Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker</s> Done.
  
Install thermistors on SBS/Big Bite magnets and junction boxes. ADC node boards made and parts stuffing is ongoing.
+
<s>Test LQ2 FuG with new polarity reversal switch.</s> No longer needed.
  
Install Klixons on SBB and connect to power supply.
+
Find and connect NMR cables in CH
  
Install Klixons on BB and connect to power supply.
+
Gas manifolds for GEM gas cylinders (started)
  
Rpi for threshhold monitoring for DAQ
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
Test LQ2 FuG with new polarity reversal switch.
+
Gas mix controller and MFCs for GEM detectors (not started)
 
+
Verify LQ2 has LCW reconnected.
+
 
+
== Would Be Good To Do Items ==
+
 
+
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
  
 
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
 
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
  
Remove actuators from right arm magnets. (Dipole complete)
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 52: Line 46:
  
 
Swap out MFCs in VDC mixing system
 
Swap out MFCs in VDC mixing system
 
Remove three Oxford power supplies from HMS
 
  
 
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
 
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
 +
 +
Calibrate and op-check spare warm return valves for Hall C.
 +
 +
== PARTS ORDER LIST FOR 1 OCT ==
 +
 +
-2 wire cable,
 +
ferrules,
 +
\# 6 hardware
  
 
== Possible Future Items ==
 
== Possible Future Items ==

Latest revision as of 14:11, 13 October 2021

Priority Items

Jumper bars for SBB coils Done.

Controls for SBB and corrector coils (software updates and re-test) Done.

Install magnet leads for SBB (535 MCM cable) Done.

Connect magnet leads for SBB corrector magnets Done.

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, SBS needs tested)

Install thermistors on SBS/Big Bite magnets and junction boxes. Done.

Install Klixons on SBB. Done.

Mount Left Shield House temperature readout in CH

Find video cables from hall in the CH

Measure current on 12V supplies in HMS magnet supplies when hall C is open long enough Done.

Would Be Good To Do Items

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker Done.

Test LQ2 FuG with new polarity reversal switch. No longer needed.

Find and connect NMR cables in CH

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Swap out MFCs in VDC mixing system

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

PARTS ORDER LIST FOR 1 OCT

-2 wire cable, ferrules, \# 6 hardware

Possible Future Items

Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).