Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"

From Hall A Wiki
Jump to: navigation, search
(Would Be Good To Do Items)
 
(50 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
== Priority Items ==
 
== Priority Items ==
  
<s>Hall A Moller Polarimeter target magnet testing (Simona's turn when she's ready, and any fixes afterward if necessary)</s> Finally done! :D Everything is working and ran up to full current without issue.
+
<s>Replace power cord on battery charger in golf car 24</s> Done.
  
Install S0 counter above BB for a cosmics trigger.
+
<s>Ellen's To-do during Wednesday access: Shutdown Moller compressor, fix hall A daq threshold pi, replace batteries in SHMS UPS</s> All done.
  
Locking bar for the Right Shield House (needs to be installed and demonstrated it will keep door closed)
+
Install VVU on SBB power supply - VVU is by the supply
  
Jumper bars for SBB coils (in progress)
+
Install spring washers on SBB and BB busbars and connections
  
Controls for SBB and corrector coils (waiting for water to the magnets)
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 +
 
 +
Fix LCW leak in LD1 Dynapower
 +
 
 +
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
 +
 
 +
Buy and replace MFCs in old FPP mixing system - MFCs on order
  
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)
+
Replace ground fault module in LQ1 power supply - on order
  
Connect magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections)
+
Replace air compressor in Hall A Gas Shed
  
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
Find video cables from hall in the CH
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
Line 23: Line 29:
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
== Would Be Good To Do Items ==
  
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, needs tested)
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
Install thermistors on SBS/Big Bite magnets and junction boxes. <s>ADC node boards made and parts stuffing is ongoing.</s> Should have enough boards now. Software is basically done, but will need to be updated after all thermistors are in place.
+
clean up R-arm supply platform
  
Install Klixons on SBB and connect to power supply.
+
clean up L-arm supply platform
  
<s>Install Klixons on BB and connect to power supply.</s> Done.
+
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
  
<s>Rpi for threshhold monitoring for DAQ</s> Done.
+
Calibrate and op-check spare warm return valves for Hall C.
  
Test LQ2 FuG with new polarity reversal switch.
+
Hall C Moller: setup new chiller, repair compressor, modify bertha
  
Verify LQ2 has LCW reconnected.
+
Add bypass switch for SHMS UPS?
  
== Would Be Good To Do Items ==
+
<s>Get NMR signals from HMS NMR to counting room</s> Done.
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
== PARTS ORDER LIST FOR 1 OCT ==
  
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
+
-2 wire cable,
 +
ferrules,
 +
\# 6 hardware
  
Remove actuators from right arm magnets. (Dipole complete)
+
== Do We Still Need To Do These? ==
  
clean up R-arm supply platform
+
Test LQ2 FuG with new polarity reversal switch.
  
clean up L-arm supply platform
+
Mount Left Shield House temperature readout in CH
 +
 
 +
Find and connect NMR cables in CH
  
 
Swap out MFCs in VDC mixing system
 
Swap out MFCs in VDC mixing system
 
Remove three Oxford power supplies from HMS
 
 
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
 
  
 
== Possible Future Items ==
 
== Possible Future Items ==
 
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
 
  
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Remote reset for Hall C spectrometer motion (maybe next year)
  
 
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
 
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Latest revision as of 14:09, 1 December 2021

Priority Items

Replace power cord on battery charger in golf car 24 Done.

Ellen's To-do during Wednesday access: Shutdown Moller compressor, fix hall A daq threshold pi, replace batteries in SHMS UPS All done.

Install VVU on SBB power supply - VVU is by the supply

Install spring washers on SBB and BB busbars and connections

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Fix LCW leak in LD1 Dynapower

Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen

Buy and replace MFCs in old FPP mixing system - MFCs on order

Replace ground fault module in LQ1 power supply - on order

Replace air compressor in Hall A Gas Shed

Find video cables from hall in the CH

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

Hall C Moller: setup new chiller, repair compressor, modify bertha

Add bypass switch for SHMS UPS?

Get NMR signals from HMS NMR to counting room Done.

PARTS ORDER LIST FOR 1 OCT

-2 wire cable, ferrules, \# 6 hardware

Do We Still Need To Do These?

Test LQ2 FuG with new polarity reversal switch.

Mount Left Shield House temperature readout in CH

Find and connect NMR cables in CH

Swap out MFCs in VDC mixing system

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).