Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"

From Hall A Wiki
Jump to: navigation, search
(One intermediate revision by one other user not shown)
Line 7: Line 7:
 
<s>HMS Q2 lead voltage drops</s> Done
 
<s>HMS Q2 lead voltage drops</s> Done
  
Heaters for SHMS magnet flags.
+
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller
  
Hall A cooldown.
+
Hall A cooldown./Done
  
Heaters for HMS magnet flags-Heaters-modifications to guards complete, heaters installed.  Waiting on controller.
+
Heaters for HMS magnet flags-Heaters, modifications to guards complete, heaters installed.  Waiting on controller.
  
 
Help Brad re-configure the DAQ rack in Counting Room C
 
Help Brad re-configure the DAQ rack in Counting Room C
Line 33: Line 33:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live.
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (Steve).
  
 
Remove actuators from right arm magnets. (Dipole complete)
 
Remove actuators from right arm magnets. (Dipole complete)
Line 52: Line 52:
  
 
<s>Reconnect Magnet On signs to the HMS supplies</s> Done
 
<s>Reconnect Magnet On signs to the HMS supplies</s> Done
 +
 +
Hall A moller re-install: target install and survey, compressor and chiller clean up and setup, testing
 +
 +
Connect beamline magnets to FSD
 +
 +
Move SHMS lead flow controllers/Done

Revision as of 14:41, 2 August 2021

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new one for SBS supply

Swap out MFCs in VDC mixing system

Remove three Oxford power supplies from HMS

HMS Q2 lead voltage drops Done

Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller

Hall A cooldown./Done

Heaters for HMS magnet flags-Heaters, modifications to guards complete, heaters installed. Waiting on controller.

Help Brad re-configure the DAQ rack in Counting Room C

Swap out CAEN HV crate in Counting Room C

Controls for SBS corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

Replace air compressor in Hall A Gas Shed

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (Steve).

Remove actuators from right arm magnets. (Dipole complete)

HMS supply control boxes into the Shield Hut Done

Gas mix controller for GEM detectors

Fix relay box for HMS counting room E-Stops Done

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker

Readout for LCW pressure sensors added at end of beamline walkway

Remote reset for Hall C spectrometer motion

Install new quench protection boards in Hall A LD1

Reconnect Magnet On signs to the HMS supplies Done

Hall A moller re-install: target install and survey, compressor and chiller clean up and setup, testing

Connect beamline magnets to FSD

Move SHMS lead flow controllers/Done