Line 6: | Line 6: | ||
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21 | Help Brad re-configure the DAQ rack in Counting Room C - May 17-21 | ||
− | |||
− | |||
Controls for corrector coils | Controls for corrector coils |
Revision as of 10:40, 19 May 2021
Heaters for HMS magnet flags
Release Right Shield House door controls from support and drop them down - tie back to platform legs
Make replacement backup batteries for Hall C PLCs - install - install new UPS
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
Controls for corrector coils
Finish the installation of the Hall C Moller VME crate
Re-tap the SBS supply main transformer for full power
re-install ground fault detector in LQ1 supply - requires configuration of module
connect power and LCW to BB supply on R-arm platform
re-locate displays for hacweb11 and 14
clean up R-arm supply platform
clean up L-arm supply platform
Troubleshoot Hall A right arm snout
Install new liquid level meters on SHMS
Remove actuators from right arm magnets
HMS supply control boxes into the Shield Hut
Gas mix controller for GEM detectors