Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"
Line 30: | Line 30: | ||
Gas mix controller for GEM detectors | Gas mix controller for GEM detectors | ||
+ | |||
+ | Fix relay box for HMS counting room E-Stops |
Revision as of 14:27, 21 May 2021
Heaters for HMS magnet flags
Release Right Shield House door controls from support and drop them down - tie back to platform legs
Make replacement backup batteries for Hall C PLCs - install - install new UPS
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
Controls for corrector coils
Re-tap the SBS supply main transformer for full power
re-install ground fault detector in LQ1 supply - requires configuration of module
connect power and LCW to BB supply on R-arm platform
re-locate displays for hacweb11 and 14
clean up R-arm supply platform
clean up L-arm supply platform
Troubleshoot Hall A right arm snout
Install new liquid level meters on SHMS
Remove actuators from right arm magnets
HMS supply control boxes into the Shield Hut
Gas mix controller for GEM detectors
Fix relay box for HMS counting room E-Stops