Remove three Oxford power supplies from HMS
HMS Q2 lead voltage drops
Heaters for SHMS magnet flags
Heaters for HMS magnet flags
Make replacement backup batteries for Hall C PLCs - install - install new UPS
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
Controls for corrector coils
Re-tap the SBS supply main transformer for full power
re-install ground fault detector in LQ1 supply - requires configuration of module
connect power and LCW to BB supply on R-arm platform
re-locate displays for hacweb11 and 14
clean up R-arm supply platform
clean up L-arm supply platform
Install new liquid level meters on SHMS
Remove actuators from right arm magnets
HMS supply control boxes into the Shield Hut
Gas mix controller for GEM detectors
Fix relay box for HMS counting room E-Stops