Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"
(→Would Be Good To Do Items) |
(→Priority Items) |
||
(13 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
== Priority Items == | == Priority Items == | ||
− | |||
− | |||
Install VVU on SBB power supply - VVU is by the supply | Install VVU on SBB power supply - VVU is by the supply | ||
Line 10: | Line 8: | ||
Fix LCW leak in LD1 Dynapower | Fix LCW leak in LD1 Dynapower | ||
+ | |||
+ | Replace pressure sensors on the Hall A Ethane manifold - PR for sensors to be submitted in January | ||
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen | Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen | ||
− | Replace ground fault module in LQ1 power supply - on | + | Buy and replace MFCs in old FPP mixing system - MFCs on order |
+ | |||
+ | Replace ground fault module in LQ1 power supply - on 2nd floor of CH | ||
Replace air compressor in Hall A Gas Shed | Replace air compressor in Hall A Gas Shed | ||
Line 20: | Line 22: | ||
Gas manifolds for GEM gas cylinders (started) | Gas manifolds for GEM gas cylinders (started) | ||
+ | |||
+ | |||
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started) | Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started) | ||
Gas mix controller and MFCs for GEM detectors (not started) | Gas mix controller and MFCs for GEM detectors (not started) | ||
+ | |||
+ | Determine 100% liquid level set point/Hall C magnets. | ||
+ | |||
+ | Build better "shield hut" for SHMS lead flow controllers. | ||
+ | |||
+ | Warm up HB. | ||
+ | |||
+ | Add "T's" and pump out ports to HMS magnet vacuum gage ports. | ||
+ | |||
+ | Add ventilation to SHMS Dipole flow meter shielding. | ||
+ | |||
+ | Find 4 atmos leak in Hall C. | ||
+ | |||
+ | Move ozone meters from VME to PI. | ||
+ | |||
+ | Add fan to beamline side lead (HB) | ||
+ | |||
+ | Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater. | ||
+ | |||
+ | Move equipment back to UPS power | ||
== Would Be Good To Do Items == | == Would Be Good To Do Items == | ||
Line 36: | Line 60: | ||
Calibrate and op-check spare warm return valves for Hall C. | Calibrate and op-check spare warm return valves for Hall C. | ||
− | |||
− | |||
Hall C Moller: setup new chiller, repair compressor, modify bertha | Hall C Moller: setup new chiller, repair compressor, modify bertha | ||
Add bypass switch for SHMS UPS? | Add bypass switch for SHMS UPS? | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Do We Still Need To Do These? == | == Do We Still Need To Do These? == |
Revision as of 09:11, 21 December 2021
Contents
Priority Items
Install VVU on SBB power supply - VVU is by the supply
Install spring washers on SBB and BB busbars and connections
Readout for LCW pressure sensors added at end of beamline walkway (not started)
Fix LCW leak in LD1 Dynapower
Replace pressure sensors on the Hall A Ethane manifold - PR for sensors to be submitted in January
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
Buy and replace MFCs in old FPP mixing system - MFCs on order
Replace ground fault module in LQ1 power supply - on 2nd floor of CH
Replace air compressor in Hall A Gas Shed
Find video cables from hall in the CH
Gas manifolds for GEM gas cylinders (started)
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
Gas mix controller and MFCs for GEM detectors (not started)
Determine 100% liquid level set point/Hall C magnets.
Build better "shield hut" for SHMS lead flow controllers.
Warm up HB.
Add "T's" and pump out ports to HMS magnet vacuum gage ports.
Add ventilation to SHMS Dipole flow meter shielding.
Find 4 atmos leak in Hall C.
Move ozone meters from VME to PI.
Add fan to beamline side lead (HB)
Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.
Move equipment back to UPS power
Would Be Good To Do Items
Remove actuators from right arm magnets. (Dipole/Q3 complete)
clean up R-arm supply platform
clean up L-arm supply platform
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
Calibrate and op-check spare warm return valves for Hall C.
Hall C Moller: setup new chiller, repair compressor, modify bertha
Add bypass switch for SHMS UPS?
Do We Still Need To Do These?
Test LQ2 FuG with new polarity reversal switch.
Mount Left Shield House temperature readout in CH
Find and connect NMR cables in CH
Swap out MFCs in VDC mixing system
Possible Future Items
Remote reset for Hall C spectrometer motion (maybe next year)
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).