== Priority Items ==
 
== Priority Items ==
  
Hall A Moller Polarimeter target magnet re-install: target install and survey, compressor and chiller clean up and setup, testing
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Low voltage connections for BB detectors
+
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
  
Controls for SBB and corrector coils
+
Buy and replace MFCs in old FPP mixing system - MFCs on order
  
Re-tap the SBB supply main transformer for full power
+
Replace air compressor in Hall A Gas Shed - asked for quote
  
Connect 480VAC for SBB and corrector power supplies
+
Gas manifolds for GEM gas cylinders (started)
  
Install magnet leads for SBB (535 MCM cable)
+
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
  
Install magnet leads for SBB corrector magnets (2 AWG welding cable)
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
Connect SBB and corrector magnets to FSD
+
Gas mix controller and MFCs for GEM detectors (not started)
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
Determine 100% liquid level set point/Hall C magnets.
  
connect power and LCW to BB supply on R-arm platform
+
Warm up HB.
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (Steve).
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.
  
Gas manifolds for GEM gas cylinders
+
Add ventilation to SHMS Dipole flow meter shielding.
  
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller)
+
Find 4 atmos leak in Hall C.
  
Gas mix controller and MFCs for GEM detectors
+
Move ozone meters from VME to PI.
  
Readout for LCW pressure sensors added at end of beamline walkway
+
Add fan to beamline side lead (HB)
 
+
Re-install crash buttons in Hall A Counting Room - <s>RQ1 button for BB</s> and new ones for SBS supply and correctors
+
  
 +
Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.
  
 
== Would Be Good To Do Items ==
 
== Would Be Good To Do Items ==
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
 
+
Remove actuators from right arm magnets. (Dipole complete)
+
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 44: Line 41:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Swap out MFCs in VDC mixing system
+
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
  
Remove three Oxford power supplies from HMS
+
Calibrate and op-check spare warm return valves for Hall C.
  
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller
+
Add bypass switch for SHMS UPS - Switch ordered
  
Heaters for HMS magnet flags-Heaters, modifications to guards complete, heaters installed.  Waiting on controller.
+
== Do We Still Need To Do These? ==
  
 +
== Possible Future Items ==
  
 +
Remote reset for Hall C spectrometer motion (maybe next year)
  
== Possible Future Items ==
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
  
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
+
Fix LCW leak in LD1 Dynapower
  
Remote reset for Hall C spectrometer motion (maybe next year)
+
Replace pressure sensors on the Hall A Ethane manifold
 +
 
 +
Replace ground fault module in LQ1 power supply
 +
 
 +
Test LQ2 FuG with new polarity reversal switch.
 +
 
 +
Swap out MFCs in VDC mixing system

Revision as of 17:16, 31 March 2022

Priority Items

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen

Buy and replace MFCs in old FPP mixing system - MFCs on order

Replace air compressor in Hall A Gas Shed - asked for quote

Gas manifolds for GEM gas cylinders (started)

Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Determine 100% liquid level set point/Hall C magnets.

Warm up HB.

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.

Add ventilation to SHMS Dipole flow meter shielding.

Find 4 atmos leak in Hall C.

Move ozone meters from VME to PI.

Add fan to beamline side lead (HB)

Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

Add bypass switch for SHMS UPS - Switch ordered

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Fix LCW leak in LD1 Dynapower

Replace pressure sensors on the Hall A Ethane manifold

Replace ground fault module in LQ1 power supply

Test LQ2 FuG with new polarity reversal switch.

Swap out MFCs in VDC mixing system