== Priority Items ==
 
== Priority Items ==
  
Hall A Moller Polarimeter target magnet re-install: helium recharge, compressor and chiller clean up and setup, testing (pumping down on cold head)
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller, fans installed, managing ice well.
+
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
  
<s>Heaters for HMS magnet flags-Heaters</s> Done. Monitoring to determine heater trip points.
+
Buy and replace MFCs in old FPP mixing system - MFCs on order
  
Install S0 counter above BB for a cosmics trigger.
+
Replace air compressor in Hall A Gas Shed - asked for quote
  
Locking bar for the Right Shield House (have bar - needs two holes drilled)
+
Gas manifolds for GEM gas cylinders (started)
  
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
+
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
  
Jumper bars for SBB coils (copper bus bar ordered)
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
Controls for SBB and corrector coils (waiting for power to the supplies)
+
Gas mix controller and MFCs for GEM detectors (not started)
  
Re-tap the SBB supply main transformer for full power (Joe will start after renewing his training)
+
Determine 100% liquid level set point/Hall C magnets.
  
Connect 480VAC for SBB and corrector power supplies (waiting on the electricians - ordered outlets and plugs)
+
Warm up HB.
  
Ground power supplies and corrector supply racks in DAQ Bunker (not started)
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.
  
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)
+
Add ventilation to SHMS Dipole flow meter shielding.
  
Install magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections, only three power supplies in rack)
+
Find 4 atmos leak in Hall C.
  
Connect SBB and corrector magnets to FSD (ADC is installed)(cables run/landed and verified, ch1 upstream left, ch2 upstream right, ch3 downstream left, ch4 downstream right, ch5 SBS)
+
Move ozone meters from VME to PI.
  
Ground HCAL DAQ racks
+
Add fan to beamline side lead (HB)
  
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.
  
connect LCW to BB supply on R-arm platform (not started)
+
== Would Be Good To Do Items ==
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
Gas manifolds for GEM gas cylinders (started)
+
clean up R-arm supply platform
  
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
+
clean up L-arm supply platform
  
Gas mix controller and MFCs for GEM detectors (not started)
+
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
Calibrate and op-check spare warm return valves for Hall C.
  
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (mostly done)
+
Add bypass switch for SHMS UPS - Switch ordered
  
Install thermistors on SBS/Big Bite magnets and junction boxes. ADC node boards made and parts stuffing is ongoing.
+
== Do We Still Need To Do These? ==
  
Install Kilxons on SBS?
+
== Possible Future Items ==
  
Install Klixons on Big Bite?
+
Remote reset for Hall C spectrometer motion (maybe next year)
  
DSG SBS gas flow monitoring needs a driver and node. Node needs to be stuffed. RPis need a PDU.
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
  
Rpi for threshhold monitoring for DAC
+
Fix LCW leak in LD1 Dynapower
  
== Would Be Good To Do Items ==
+
Replace pressure sensors on the Hall A Ethane manifold
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Replace ground fault module in LQ1 power supply
  
Remove actuators from right arm magnets. (Dipole complete)
+
Test LQ2 FuG with new polarity reversal switch.
 
+
clean up R-arm supply platform
+
 
+
clean up L-arm supply platform
+
  
 
Swap out MFCs in VDC mixing system
 
Swap out MFCs in VDC mixing system
 
Remove three Oxford power supplies from HMS
 
 
 
 
== Possible Future Items ==
 
 
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
 
 
Remote reset for Hall C spectrometer motion (maybe next year)
 

Revision as of 17:16, 31 March 2022

Priority Items

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen

Buy and replace MFCs in old FPP mixing system - MFCs on order

Replace air compressor in Hall A Gas Shed - asked for quote

Gas manifolds for GEM gas cylinders (started)

Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Determine 100% liquid level set point/Hall C magnets.

Warm up HB.

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.

Add ventilation to SHMS Dipole flow meter shielding.

Find 4 atmos leak in Hall C.

Move ozone meters from VME to PI.

Add fan to beamline side lead (HB)

Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

Add bypass switch for SHMS UPS - Switch ordered

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Fix LCW leak in LD1 Dynapower

Replace pressure sensors on the Hall A Ethane manifold

Replace ground fault module in LQ1 power supply

Test LQ2 FuG with new polarity reversal switch.

Swap out MFCs in VDC mixing system