− | + | == Priority Items == | |
− | + | Readout for LCW pressure sensors added at end of beamline walkway (not started) | |
− | + | Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen | |
− | + | Buy and replace MFCs in old FPP mixing system - MFCs on order | |
− | + | Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer. | |
− | + | Gas manifolds for GEM gas cylinders (started) | |
− | + | Replacement for EEL two cylinder gas cart - ordered, waiting on delivery | |
− | + | Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown | |
− | + | Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started) | |
− | + | Gas mix controller and MFCs for GEM detectors (not started) | |
− | + | Warm up HB.-Done | |
− | + | Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done. | |
− | + | Add ventilation to SHMS Dipole flow meter shielding.-Done | |
− | + | Find 4 atmos leak in Hall C.-In Hall snoop of lines and isolation done. | |
− | + | Move ozone meters from VME to PI. | |
− | + | Add fan to beamline side lead (HB)-Done | |
− | + | Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.-Done | |
− | + | == Would Be Good To Do Items == | |
− | Remove actuators from right arm magnets. (Dipole complete) | + | Remove actuators from right arm magnets. (Dipole/Q3 complete) |
− | + | clean up R-arm supply platform | |
− | + | clean up L-arm supply platform | |
− | + | HMS/SHMS Heater and fan changes, fixes, upgrades etc.-Done | |
− | + | Calibrate and op-check spare warm return valves for Hall C.-Done- new controller for testing and calibration being built. | |
− | + | Add bypass switch for SHMS UPS - Switch ordered-Done. | |
− | + | Build local valve control boxes with local read out. | |
− | + | Build new controller for warm return valves. | |
− | + | op check/repair hall C vacuum gauges. | |
− | + | == Do We Still Need To Do These? == | |
− | + | == Possible Future Items == | |
− | + | Remote reset for Hall C spectrometer motion (maybe next year) |
Revision as of 06:41, 22 June 2022
Contents
Priority Items
Readout for LCW pressure sensors added at end of beamline walkway (not started)
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
Buy and replace MFCs in old FPP mixing system - MFCs on order
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
Gas manifolds for GEM gas cylinders (started)
Replacement for EEL two cylinder gas cart - ordered, waiting on delivery
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
Gas mix controller and MFCs for GEM detectors (not started)
Warm up HB.-Done
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
Add ventilation to SHMS Dipole flow meter shielding.-Done
Find 4 atmos leak in Hall C.-In Hall snoop of lines and isolation done.
Move ozone meters from VME to PI.
Add fan to beamline side lead (HB)-Done
Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.-Done
Would Be Good To Do Items
Remove actuators from right arm magnets. (Dipole/Q3 complete)
clean up R-arm supply platform
clean up L-arm supply platform
HMS/SHMS Heater and fan changes, fixes, upgrades etc.-Done
Calibrate and op-check spare warm return valves for Hall C.-Done- new controller for testing and calibration being built.
Add bypass switch for SHMS UPS - Switch ordered-Done.
Build local valve control boxes with local read out.
Build new controller for warm return valves.
op check/repair hall C vacuum gauges.
Do We Still Need To Do These?
Possible Future Items
Remote reset for Hall C spectrometer motion (maybe next year)