Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"

From Hall A Wiki
Jump to: navigation, search
(114 intermediate revisions by 4 users not shown)
Line 1: Line 1:
Heaters for HMS magnet flags
+
== Priority Items ==
  
Make replacement backup batteries for Hall C PLCs - install - install new UPS
+
Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor
  
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
+
Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered
  
Controls for corrector coils
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Re-tap the SBS supply main transformer for full power
+
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
Gas manifolds for GEM gas cylinders (started)
  
connect power and LCW to BB supply on R-arm platform
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
re-locate displays for hacweb11 and 14
+
Gas mix controller and MFCs for GEM detectors (not started)
 +
 
 +
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
 +
 
 +
Move ozone meters from VME to PI.
 +
 
 +
== Would Be Good To Do Items ==
 +
 
 +
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 19: Line 27:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS
+
Build new controller for testing and calibration warm return valves for Hall C
 +
 
 +
Build local valve control boxes with local read out.
 +
 
 +
op check/repair hall C vacuum gauges.
 +
 
 +
Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor
  
Remove actuators from right arm magnets
+
Cut and install poly shielding around HVAC controls on the Right HRS
  
HMS supply control boxes into the Shield Hut
+
== Do We Still Need To Do These? ==
  
Gas mix controller for GEM detectors
+
== Possible Future Items ==
  
Fix relay box for HMS counting room E-Stops
+
Remote reset for Hall C spectrometer motion (maybe next year)

Revision as of 13:18, 12 August 2022

Priority Items

Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor

Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Move ozone meters from VME to PI.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor

Cut and install poly shielding around HVAC controls on the Right HRS

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)