Remove three Oxford power supplies from HMS
+
== Priority Items ==
  
HMS Q2 lead voltage drops
+
Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor
  
Heaters for SHMS magnet flags
+
Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered
  
Heaters for HMS magnet flags
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Make replacement backup batteries for Hall C PLCs - install - install new UPS
+
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
  
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
+
Gas manifolds for GEM gas cylinders (started)
  
Controls for corrector coils
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
Re-tap the SBS supply main transformer for full power
+
Gas mix controller and MFCs for GEM detectors (not started)
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
  
connect power and LCW to BB supply on R-arm platform
+
Move ozone meters from VME to PI.
  
re-locate displays for hacweb11 and 14
+
== Would Be Good To Do Items ==
 +
 
 +
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 25: Line 27:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS
+
Build new controller for testing and calibration warm return valves for Hall C
 +
 
 +
Build local valve control boxes with local read out.
 +
 
 +
op check/repair hall C vacuum gauges.
 +
 
 +
Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor
  
Remove actuators from right arm magnets
+
Cut and install poly shielding around HVAC controls on the Right HRS
  
HMS supply control boxes into the Shield Hut
+
== Do We Still Need To Do These? ==
  
Gas mix controller for GEM detectors
+
== Possible Future Items ==
  
Fix relay box for HMS counting room E-Stops
+
Remote reset for Hall C spectrometer motion (maybe next year)

Latest revision as of 13:18, 12 August 2022

Priority Items

Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor

Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Move ozone meters from VME to PI.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor

Cut and install poly shielding around HVAC controls on the Right HRS

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)