== Priority Items == | == Priority Items == | ||
− | + | Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor | |
− | + | Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered | |
− | + | Readout for LCW pressure sensors added at end of beamline walkway (not started) | |
− | + | Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer. | |
− | + | Gas manifolds for GEM gas cylinders (started) | |
− | + | Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started) | |
− | + | Gas mix controller and MFCs for GEM detectors (not started) | |
− | + | Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done. | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
+ | Move ozone meters from VME to PI. | ||
== Would Be Good To Do Items == | == Would Be Good To Do Items == | ||
− | + | Remove actuators from right arm magnets. (Dipole/Q3 complete) | |
− | + | ||
− | Remove actuators from right arm magnets. (Dipole complete) | + | |
clean up R-arm supply platform | clean up R-arm supply platform | ||
Line 58: | Line 27: | ||
clean up L-arm supply platform | clean up L-arm supply platform | ||
− | + | Build new controller for testing and calibration warm return valves for Hall C | |
− | + | Build local valve control boxes with local read out. | |
− | + | op check/repair hall C vacuum gauges. | |
− | + | Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor | |
+ | Cut and install poly shielding around HVAC controls on the Right HRS | ||
+ | == Do We Still Need To Do These? == | ||
== Possible Future Items == | == Possible Future Items == | ||
− | |||
− | |||
Remote reset for Hall C spectrometer motion (maybe next year) | Remote reset for Hall C spectrometer motion (maybe next year) |
Revision as of 12:18, 12 August 2022
Contents
Priority Items
Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor
Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered
Readout for LCW pressure sensors added at end of beamline walkway (not started)
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
Gas manifolds for GEM gas cylinders (started)
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
Gas mix controller and MFCs for GEM detectors (not started)
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
Move ozone meters from VME to PI.
Would Be Good To Do Items
Remove actuators from right arm magnets. (Dipole/Q3 complete)
clean up R-arm supply platform
clean up L-arm supply platform
Build new controller for testing and calibration warm return valves for Hall C
Build local valve control boxes with local read out.
op check/repair hall C vacuum gauges.
Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor
Cut and install poly shielding around HVAC controls on the Right HRS
Do We Still Need To Do These?
Possible Future Items
Remote reset for Hall C spectrometer motion (maybe next year)