== Priority Items ==
 
== Priority Items ==
  
<s>Hall A Moller Polarimeter target magnet testing (Simona's turn when she's ready, and any fixes afterward if necessary)</s> Finally done! :D Everything is working and ran up to full current without issue.
+
Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor
  
Install S0 counter above BB for a cosmics trigger.
+
Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered
  
Locking bar for the Right Shield House (needs to be installed and demonstrated it will keep door closed)
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
+
Jumper bars for SBB coils (in progress)
+
 
+
Controls for SBB and corrector coils (waiting for water to the magnets)
+
 
+
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)
+
 
+
Connect magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections)
+
  
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
Line 23: Line 15:
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
  
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (Done, needs tested)
+
Move ozone meters from VME to PI.
 
+
Install thermistors on SBS/Big Bite magnets and junction boxes. <s>ADC node boards made and parts stuffing is ongoing.</s> Should have enough boards now. Software is basically done, but will need to be updated after all thermistors are in place.
+
 
+
Install Klixons on SBB and connect to power supply.
+
 
+
<s>Install Klixons on BB and connect to power supply.</s> Done.
+
 
+
<s>Rpi for threshhold monitoring for DAQ</s> Done.
+
 
+
Test LQ2 FuG with new polarity reversal switch.
+
 
+
Verify LQ2 has LCW reconnected.
+
  
 
== Would Be Good To Do Items ==
 
== Would Be Good To Do Items ==
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
 
+
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
+
 
+
Remove actuators from right arm magnets. (Dipole complete)
+
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 51: Line 27:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Swap out MFCs in VDC mixing system
+
Build new controller for testing and calibration warm return valves for Hall C
  
Remove three Oxford power supplies from HMS
+
Build local valve control boxes with local read out.
  
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
+
op check/repair hall C vacuum gauges.
  
== PARTS ORDER LIST FOR 1 OCT ==
+
Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor
  
-2 wire cable,
+
Cut and install poly shielding around HVAC controls on the Right HRS
ferrules,
+
 
\# 6 hardware
+
== Do We Still Need To Do These? ==
  
 
== Possible Future Items ==
 
== Possible Future Items ==
 
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
 
  
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
 

Revision as of 13:18, 12 August 2022

Priority Items

Replace PLC relay card on SHMS Dipole - spare card is on the 2nd floor

Install 230V -> 115V transformers for +/-15V supplies dying in Hall C Danfysik supplies - transformers ordered

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Move ozone meters from VME to PI.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor

Cut and install poly shielding around HVAC controls on the Right HRS

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)