Heaters for HMS magnet flags
+
== Priority Items ==
  
Release Right Shield House door controls from support and drop them down - tie back to platform legs
+
SE-II search
  
Make replacement backup batteries for Hall C PLCs - install - install new UPS
+
HMS drift chamber low voltage supply replacements
  
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
+
Moller maintenance OSP
  
Controls for corrector coils
+
SBS corrector OSP?
  
Finish the installation of the Hall C Moller VME crate
+
Sieve slit controllers OSP
  
Re-tap the SBS supply main transformer for full power
+
VVUs on HMS
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
Guards on HMS dipole leads
  
connect power and LCW to BB supply on R-arm platform
+
Oscillator for LN2 level meter
  
re-locate displays for hacweb11 and 14
+
BigBite Argon manifold pressure sensor erratic. Need to clean the connections?
  
clean up R-arm supply platform
+
Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?
  
clean up L-arm supply platform
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Troubleshoot Hall A right arm snout
+
== Cryo ==
  
Install new liquid level meters on SHMS
+
Pump-out (CVI) replacement (Lars)
  
Remove actuators from right arm magnets
+
Remove actuators from right arm magnets (Hall A). (Dipole/Q3 complete)
  
HMS supply control boxes into the Shield Hut
+
Build local valve control boxes with local read out.
  
Gas mix controller for GEM detectors
+
op check/repair hall C vacuum gauges (in progress - Lars)
 +
 
 +
Troubleshoot HMS Q1 LN2 temp sensors.
 +
 
 +
Check HMS Quad magnet leads for leaks/repair.
 +
 
 +
Troubleshoot HMS Dipole LN2 siphon temp.
 +
 
 +
Extend HMS Q1 warm return control wires and re-terminate/calibrate.
 +
 
 +
Check all JT actuators, ensure belt is functional and in the correct orientation.
 +
 
 +
Insulate HMS N2 4k shield (stinger) return line.
 +
 
 +
Insulate SHMS Warm return line across pivot.
 +
 
 +
Repair calibrate warm return valve spares.
 +
 
 +
Repair calibrate JT valve spares.
 +
 
 +
Troubleshoot HMS Quad Vac gauges.
 +
 
 +
Move the SHMS lead flow controllers and coordinate with the Cryo group (need engineering support).
 +
 
 +
SHMS Lead flow, - add upstream valves to isolate each lead flow, for easier replacement of valve/flow meter. (install when meters are moved to new location)
 +
 
 +
Update code for the new temperature sensor installed on the HX N2 vent on the HMS.
 +
 
 +
Move temps from Honeywell to PLC controls. (if channels are available)
 +
 
 +
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.
 +
 
 +
 
 +
 
 +
 
 +
 
 +
Warm up SHMS Dipole.
 +
 
 +
De-sting SHMS 4k He supply transfer line.
 +
 
 +
Repair SHMS 4k supply transfer line ball valve assembly.
 +
 
 +
Re-sting SHMS 4k transfer line.
 +
 
 +
Cool SHMS Dipole, Q3, Q2, Q1.
 +
 
 +
After HB magnet electronics controls installation complete, cool HB Magnet.
 +
 
 +
Warm HMS Dipole (to 300k for lead repair)
 +
 
 +
Repair lead leak on HMS Dipole leads.
 +
 
 +
Cool HMS Dipole.
 +
 
 +
== Electrical ==
 +
 
 +
Capacitor discharge stick
 +
 
 +
Isolating power switches on HMS power supplies
 +
 
 +
Specifications for power supplies for HKS (coordinate with Sarin)
 +
 
 +
Get Unser repaired
 +
 
 +
Hall A Compton photon detector table motion (somebody cut the cables)
 +
 
 +
GEM low voltage distribution
 +
 
 +
== Spectrometers ==
 +
 
 +
Make HMS dipole NMR lock better
 +
 
 +
Hall probes/NMR (?) for HKS
 +
 
 +
== Gas systems ==
 +
 
 +
== Do We Still Need To Do These? ==
 +
 
 +
== Possible Future Items ==

Latest revision as of 12:10, 25 September 2023

Priority Items

SE-II search

HMS drift chamber low voltage supply replacements

Moller maintenance OSP

SBS corrector OSP?

Sieve slit controllers OSP

VVUs on HMS

Guards on HMS dipole leads

Oscillator for LN2 level meter

BigBite Argon manifold pressure sensor erratic. Need to clean the connections?

Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Cryo

Pump-out (CVI) replacement (Lars)

Remove actuators from right arm magnets (Hall A). (Dipole/Q3 complete)

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges (in progress - Lars)

Troubleshoot HMS Q1 LN2 temp sensors.

Check HMS Quad magnet leads for leaks/repair.

Troubleshoot HMS Dipole LN2 siphon temp.

Extend HMS Q1 warm return control wires and re-terminate/calibrate.

Check all JT actuators, ensure belt is functional and in the correct orientation.

Insulate HMS N2 4k shield (stinger) return line.

Insulate SHMS Warm return line across pivot.

Repair calibrate warm return valve spares.

Repair calibrate JT valve spares.

Troubleshoot HMS Quad Vac gauges.

Move the SHMS lead flow controllers and coordinate with the Cryo group (need engineering support).

SHMS Lead flow, - add upstream valves to isolate each lead flow, for easier replacement of valve/flow meter. (install when meters are moved to new location)

Update code for the new temperature sensor installed on the HX N2 vent on the HMS.

Move temps from Honeywell to PLC controls. (if channels are available)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.



Warm up SHMS Dipole.

De-sting SHMS 4k He supply transfer line.

Repair SHMS 4k supply transfer line ball valve assembly.

Re-sting SHMS 4k transfer line.

Cool SHMS Dipole, Q3, Q2, Q1.

After HB magnet electronics controls installation complete, cool HB Magnet.

Warm HMS Dipole (to 300k for lead repair)

Repair lead leak on HMS Dipole leads.

Cool HMS Dipole.

Electrical

Capacitor discharge stick

Isolating power switches on HMS power supplies

Specifications for power supplies for HKS (coordinate with Sarin)

Get Unser repaired

Hall A Compton photon detector table motion (somebody cut the cables)

GEM low voltage distribution

Spectrometers

Make HMS dipole NMR lock better

Hall probes/NMR (?) for HKS

Gas systems

Do We Still Need To Do These?

Possible Future Items