Re-install crash buttons and Gas Master in Hall A Counting Room
+
== Priority Items ==
  
Swap out MFCs in VDC mixing system
+
Install 2:1 transformers in SHMS Danfysik supplies
  
Remove three Oxford power supplies from HMS
+
Install pressure sensor in warm return in ESR
  
HMS Q2 lead voltage drops
+
Replace/repair dead MAGNET ON signs in Hall C
  
Heaters for SHMS magnet flags
+
Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?
  
Heaters for HMS magnet flags
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
+
Gas manifolds for GEM gas cylinders (started)
  
Controls for SBS corrector coils
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
Re-tap the SBS supply main transformer for full power
+
Gas mix controller and MFCs for GEM detectors (not started)
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
  
connect power and LCW to BB supply on R-arm platform
+
== Would Be Good To Do Items ==
  
re-locate displays for hacweb11 and 14
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 27: Line 27:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS
+
Build new controller for testing and calibration warm return valves for Hall C
  
Remove actuators from right arm magnets
+
Build local valve control boxes with local read out.
  
HMS supply control boxes into the Shield Hut
+
op check/repair hall C vacuum gauges.
  
Gas mix controller for GEM detectors
+
Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor
  
Fix relay box for HMS counting room E-Stops
+
Cut and install poly shielding around HVAC controls on the Right HRS
 +
 
 +
== Do We Still Need To Do These? ==
 +
 
 +
== Possible Future Items ==
 +
 
 +
Remote reset for Hall C spectrometer motion (maybe next year)

Latest revision as of 18:08, 21 November 2022

Priority Items

Install 2:1 transformers in SHMS Danfysik supplies

Install pressure sensor in warm return in ESR

Replace/repair dead MAGNET ON signs in Hall C

Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor

Cut and install poly shielding around HVAC controls on the Right HRS

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)