Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new one for SBS supply
+
== Priority Items ==
  
Swap out MFCs in VDC mixing system
+
Install 2:1 transformers in SHMS Danfysik supplies
  
Remove three Oxford power supplies from HMS
+
Install pressure sensor in warm return in ESR
  
<s>HMS Q2 lead voltage drops</s> Done
+
Replace/repair dead MAGNET ON signs in Hall C
  
Heaters for SHMS magnet flags.
+
Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?
  
Hall A cooldown.
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Heaters for HMS magnet flags-Heaters-modifications to guards complete, heaters installed.  Waiting on controller.
+
Gas manifolds for GEM gas cylinders (started)
  
Help Brad re-configure the DAQ rack in Counting Room C
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
Swap out CAEN HV crate in Counting Room C
+
Gas mix controller and MFCs for GEM detectors (not started)
  
Controls for SBS corrector coils
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
  
Re-tap the SBS supply main transformer for full power
+
== Would Be Good To Do Items ==
  
re-install ground fault detector in LQ1 supply - requires configuration of module
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
 
+
connect power and LCW to BB supply on R-arm platform
+
 
+
Replace air compressor in Hall A Gas Shed
+
 
+
re-locate displays for hacweb11 and 14
+
  
 
clean up R-arm supply platform
 
clean up R-arm supply platform
Line 33: Line 27:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live.
+
Build new controller for testing and calibration warm return valves for Hall C
 
+
Remove actuators from right arm magnets. (Dipole complete)
+
 
+
<s>HMS supply control boxes into the Shield Hut</s> Done
+
  
Gas mix controller for GEM detectors
+
Build local valve control boxes with local read out.
  
<s>Fix relay box for HMS counting room E-Stops</s> Done
+
op check/repair hall C vacuum gauges.
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor
  
Readout for LCW pressure sensors added at end of beamline walkway
+
Cut and install poly shielding around HVAC controls on the Right HRS
  
Remote reset for Hall C spectrometer motion
+
== Do We Still Need To Do These? ==
  
Install new quench protection boards in Hall A LD1
+
== Possible Future Items ==
  
<s>Reconnect Magnet On signs to the HMS supplies</s> Done
+
Remote reset for Hall C spectrometer motion (maybe next year)

Latest revision as of 18:08, 21 November 2022

Priority Items

Install 2:1 transformers in SHMS Danfysik supplies

Install pressure sensor in warm return in ESR

Replace/repair dead MAGNET ON signs in Hall C

Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor

Cut and install poly shielding around HVAC controls on the Right HRS

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)