== Priority Items ==
 
== Priority Items ==
  
Hall A Moller Polarimeter target magnet re-install: helium recharge, compressor and chiller clean up and setup, testing (pumping down on cold head)
+
Replace power cord on battery charger in golf car 24
  
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller, fans installed, managing ice well.
+
Install VVU on SBB power supply - VVU is by the supply
  
<s>Heaters for HMS magnet flags-Heaters</s> Done. Monitoring to determine heater trip points.
+
Install spring washers on SBB and BB busbars and connections
  
Install S0 counter above BB for a cosmics trigger.
+
Readout for LCW pressure sensors added at end of beamline walkway (not started)
  
Locking bar for the Right Shield House (have bar - needs two holes drilled)
+
Fix LCW leak in LD1 Dynapower
  
Roofing material for SBS GEM bunker (located some possible material - will run past Jessie)
+
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
  
Jumper bars for SBB coils (copper bus bar ordered)
+
Buy and replace MFCs in old FPP mixing system - MFCs on order
  
Controls for SBB and corrector coils (waiting for power to the supplies)
+
Replace ground fault module in LQ1 power supply - on order
  
Re-tap the SBB supply main transformer for full power (Joe will start after renewing his training)
+
Replace air compressor in Hall A Gas Shed
  
Connect 480VAC for SBB and corrector power supplies (waiting on the electricians - ordered outlets and plugs)
+
Find video cables from hall in the CH
 
+
Ground power supplies and corrector supply racks in DAQ Bunker (not started)
+
 
+
Install magnet leads for SBB (535 MCM cable) (cables run, waiting on copper bus bars) (connections still need to be torqued)
+
 
+
Install magnet leads for SBB corrector magnets (2 AWG welding cable) (cables run, Reagan is making final connections, only three power supplies in rack)
+
 
+
Connect SBB and corrector magnets to FSD (ADC is installed)(cables run/landed and verified, ch1 upstream left, ch2 upstream right, ch3 downstream left, ch4 downstream right, ch5 SBS)
+
 
+
Ground HCAL DAQ racks
+
 
+
re-install ground fault detector in LQ1 supply - requires configuration of module (not started)
+
 
+
connect LCW to BB supply on R-arm platform (not started)
+
 
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
+
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
Line 43: Line 27:
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
  
Readout for LCW pressure sensors added at end of beamline walkway (not started)
+
== Would Be Good To Do Items ==
  
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors (mostly done)
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
Install thermistors on SBS/Big Bite magnets and junction boxes. ADC node boards made and parts stuffing is ongoing.
+
clean up R-arm supply platform
  
Install Kilxons on SBS?
+
clean up L-arm supply platform
  
Install Klixons on Big Bite?
+
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
  
DSG SBS gas flow monitoring needs a driver and node. Node needs to be stuffed. RPis need a PDU.
+
Calibrate and op-check spare warm return valves for Hall C.
  
== Would Be Good To Do Items ==
+
Hall C Moller: setup new chiller, repair compressor, modify bertha
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Add bypass switch for SHMS UPS?
  
Remove actuators from right arm magnets. (Dipole complete)
+
Get NMR signals from HMS NMR to counting room
  
clean up R-arm supply platform
+
== PARTS ORDER LIST FOR 1 OCT ==
  
clean up L-arm supply platform
+
-2 wire cable,
 +
ferrules,
 +
\# 6 hardware
  
Swap out MFCs in VDC mixing system
+
== Do We Still Need To Do These? ==
  
Remove three Oxford power supplies from HMS
+
Test LQ2 FuG with new polarity reversal switch.
  
 +
Mount Left Shield House temperature readout in CH
  
 +
Find and connect NMR cables in CH
 +
 +
Swap out MFCs in VDC mixing system
  
 
== Possible Future Items ==
 
== Possible Future Items ==
 
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
 
  
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Remote reset for Hall C spectrometer motion (maybe next year)
 +
 +
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Latest revision as of 18:22, 21 November 2021

Priority Items

Replace power cord on battery charger in golf car 24

Install VVU on SBB power supply - VVU is by the supply

Install spring washers on SBB and BB busbars and connections

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Fix LCW leak in LD1 Dynapower

Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen

Buy and replace MFCs in old FPP mixing system - MFCs on order

Replace ground fault module in LQ1 power supply - on order

Replace air compressor in Hall A Gas Shed

Find video cables from hall in the CH

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

Hall C Moller: setup new chiller, repair compressor, modify bertha

Add bypass switch for SHMS UPS?

Get NMR signals from HMS NMR to counting room

PARTS ORDER LIST FOR 1 OCT

-2 wire cable, ferrules, \# 6 hardware

Do We Still Need To Do These?

Test LQ2 FuG with new polarity reversal switch.

Mount Left Shield House temperature readout in CH

Find and connect NMR cables in CH

Swap out MFCs in VDC mixing system

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).