== Priority Items ==
 
== Priority Items ==
 
Replace power cord on battery charger in golf car 24
 
 
Install VVU on SBB power supply - VVU is by the supply
 
 
Install spring washers on SBB and BB busbars and connections
 
  
 
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
Fix LCW leak in LD1 Dynapower
 
  
 
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
 
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
Line 15: Line 7:
 
Buy and replace MFCs in old FPP mixing system - MFCs on order
 
Buy and replace MFCs in old FPP mixing system - MFCs on order
  
Replace ground fault module in LQ1 power supply - on order
+
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
  
Replace air compressor in Hall A Gas Shed
+
Gas manifolds for GEM gas cylinders (started)
  
Find video cables from hall in the CH
+
Replacement for EEL two cylinder gas cart - ordered, waiting on delivery
  
Gas manifolds for GEM gas cylinders (started)
+
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
  
 
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
 
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
Line 27: Line 19:
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
  
== Would Be Good To Do Items ==
+
Warm up HB.-Done
  
Remove actuators from right arm magnets. (Dipole/Q3 complete)
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
  
clean up R-arm supply platform
+
Add ventilation to SHMS Dipole flow meter shielding.-Done
  
clean up L-arm supply platform
+
Find 4 atmos leak in Hall C.-In Hall snoop of lines and isolation done.
  
HMS/SHMS Heater and fan changes, fixes, upgrades etc.
+
Move ozone meters from VME to PI.
  
Calibrate and op-check spare warm return valves for Hall C.
+
Add fan to beamline side lead (HB)-Done
  
<s>Setup controls9</s> Done
+
Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.-Done
  
Hall C Moller: setup new chiller, repair compressor, modify bertha
+
== Would Be Good To Do Items ==
  
Add bypass switch for SHMS UPS?
+
Remove actuators from right arm magnets. (Dipole/Q3 complete)
  
Get NMR signals from HMS NMR to counting room
+
clean up R-arm supply platform
  
== PARTS ORDER LIST FOR 1 OCT ==
+
clean up L-arm supply platform
  
-2 wire cable,
+
HMS/SHMS Heater and fan changes, fixes, upgrades etc.-Done
ferrules,
+
\# 6 hardware
+
  
== Do We Still Need To Do These? ==
+
Calibrate and op-check spare warm return valves for Hall C.-Done- new controller for testing and calibration being built.
  
Test LQ2 FuG with new polarity reversal switch.
+
Add bypass switch for SHMS UPS - Switch ordered-Done.
  
Mount Left Shield House temperature readout in CH
+
Build local valve control boxes with local read out.
  
Find and connect NMR cables in CH
+
Build new controller for warm return valves.
  
Swap out MFCs in VDC mixing system
+
op check/repair hall C vacuum gauges.
 +
 
 +
== Do We Still Need To Do These? ==
  
 
== Possible Future Items ==
 
== Possible Future Items ==
  
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Remote reset for Hall C spectrometer motion (maybe next year)
 
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
 

Latest revision as of 07:41, 22 June 2022

Priority Items

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen

Buy and replace MFCs in old FPP mixing system - MFCs on order

Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.

Gas manifolds for GEM gas cylinders (started)

Replacement for EEL two cylinder gas cart - ordered, waiting on delivery

Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Warm up HB.-Done

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Add ventilation to SHMS Dipole flow meter shielding.-Done

Find 4 atmos leak in Hall C.-In Hall snoop of lines and isolation done.

Move ozone meters from VME to PI.

Add fan to beamline side lead (HB)-Done

Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.-Done

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

HMS/SHMS Heater and fan changes, fixes, upgrades etc.-Done

Calibrate and op-check spare warm return valves for Hall C.-Done- new controller for testing and calibration being built.

Add bypass switch for SHMS UPS - Switch ordered-Done.

Build local valve control boxes with local read out.

Build new controller for warm return valves.

op check/repair hall C vacuum gauges.

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)