Readout for LCW pressure sensors added at end of beamline walkway (not started) | Readout for LCW pressure sensors added at end of beamline walkway (not started) | ||
− | |||
− | |||
− | |||
− | |||
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer. | Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer. | ||
Gas manifolds for GEM gas cylinders (started) | Gas manifolds for GEM gas cylinders (started) | ||
− | |||
− | |||
− | |||
− | |||
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started) | Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started) | ||
Gas mix controller and MFCs for GEM detectors (not started) | Gas mix controller and MFCs for GEM detectors (not started) | ||
− | |||
− | |||
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done. | Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done. | ||
− | |||
− | |||
− | |||
− | |||
Move ozone meters from VME to PI. | Move ozone meters from VME to PI. | ||
− | |||
− | |||
− | |||
− | |||
== Would Be Good To Do Items == | == Would Be Good To Do Items == | ||
Line 41: | Line 23: | ||
clean up L-arm supply platform | clean up L-arm supply platform | ||
− | + | Build new controller for testing and calibration warm return valves for Hall C | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
Build local valve control boxes with local read out. | Build local valve control boxes with local read out. | ||
− | |||
− | |||
op check/repair hall C vacuum gauges. | op check/repair hall C vacuum gauges. |
Revision as of 09:12, 26 July 2022
Contents
Priority Items
Readout for LCW pressure sensors added at end of beamline walkway (not started)
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
Gas manifolds for GEM gas cylinders (started)
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
Gas mix controller and MFCs for GEM detectors (not started)
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
Move ozone meters from VME to PI.
Would Be Good To Do Items
Remove actuators from right arm magnets. (Dipole/Q3 complete)
clean up R-arm supply platform
clean up L-arm supply platform
Build new controller for testing and calibration warm return valves for Hall C
Build local valve control boxes with local read out.
op check/repair hall C vacuum gauges.
Do We Still Need To Do These?
Possible Future Items
Remote reset for Hall C spectrometer motion (maybe next year)