Line 42: | Line 42: | ||
Fix relay box for HMS counting room E-Stops | Fix relay box for HMS counting room E-Stops | ||
+ | |||
+ | Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker |
Revision as of 11:59, 15 July 2021
Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new one for SBS supply
Swap out MFCs in VDC mixing system
Remove three Oxford power supplies from HMS
HMS Q2 lead voltage drops
Heaters for SHMS magnet flags.
Hall A cooldown.
Heaters for HMS magnet flags-Heaters-modifications to guards complete, heaters installed. Waiting on controller.
Help Brad re-configure the DAQ rack in Counting Room C
Swap out CAEN HV crate in Counting Room C
Controls for SBS corrector coils
Re-tap the SBS supply main transformer for full power
re-install ground fault detector in LQ1 supply - requires configuration of module
connect power and LCW to BB supply on R-arm platform
Replace air compressor in Hall A Gas Shed
re-locate displays for hacweb11 and 14
clean up R-arm supply platform
clean up L-arm supply platform
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live.
Remove actuators from right arm magnets. (Dipole complete)
HMS supply control boxes into the Shield Hut
Gas mix controller for GEM detectors
Fix relay box for HMS counting room E-Stops
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker