He3 / H3 e,e'p experiment E12-14-011
From Hall A Wiki
The SRC Tritium Experiment (E12-14-011) is an (e,e'p) experiment in Hall A, comparing the momentum distribution of protons in tritium and helium-3. These nuclei have a large proton-neutron asymmetry, but are also isospin-mirror nuclei, meaning that the proton distribution in tritium can tell us about the neutron distribution in helium-3.
Contents
Put your travel information here
Run Coordinator Schedule
From | To | RC |
---|---|---|
April 12 | April 19 | Florian Hauenstein |
April 20 | April 22 | Eric Fuchey |
April 23 | April 30 | Barak Schmookler |
May 1 | end of run | Axel Schmidt |
Contact Info
Expert | Phone |
---|---|
Run Coordinator (RC) | 757-876-1787 |
Florian Hauenstein | (757) 746-3395 |
Reynier Cruz-Torres | (786) 398-1443 |
Machine Control Center (MCC) | 7046 |
Name | Work | Cell | |
---|---|---|---|
J.P.Chen | 7413 | (757) 218-0722 | jpchen@jlab.org |
Greg Smith | 5405 | (757) 871-4371 | smithg@jlab.org |
Silviu Covrig | 6410 | (843) 697-1753 | covrig@jlab.org |
Dave Meekins | 5434 | (757) 968-9076 | meekins@jlab.org |
Chris Keith | 5878 | (757) 746-9277 | ckeith@jlab.org |
Important Links
- Hall-A website
- Hall-A Elog
- Shift Sign-Up
- Shift Schedule (Read only)
- Run Coordinator Page
- CEBAF Status
- HRS info
Shift Instructions
- Overview
- More detailed instructions
Instructions for important tasks
- Running with the carbon-Hole target
- Running with the optics target
- Running with the dummy target
- Running with the tritium target
- Running with the helium-3 target
JLab Training
- You need to have a JLab account and be an active user.
- All trainings are available HERE.
- You can check the current status of your trainings HERE.
Regular Trainings:
The trainings that we need are:
- SAF110T - Tritium Training
- SAF116kd - Physics Division Work Governance
- SAF103 - ODH Training (Short quiz at the end)
- SAF100 - EH&S Orientation
- SAF801 - Radiation Worker Training
- If you do it for the first time you need to do a quiz at a JLab computer and a practical test. Afterwards you get your personal dosimeter
- If you renew your Radiation Worker training you only need to do the quiz.
- SAF110 - After you did all of the above you need the Hall A walkthrough.
- Read and sign the COO/ESAD/RSAD/ERG in the counting room. Electronic copies are HERE.
Tritium Target Operator Training
- Most detailed description of what to do can be found HERE.
- cryotarget training (lets you operate the standard Hall-A/C targets)
- Contact Greg, JP, and Silviu (see table above) to schedule time to receive a lecture. Lecture slides HERE.
- Lecture training followed by a practical training with one of them.
- Take half a shift with a trained Target Operator.
- Once the steps above are completed, send an email to Meekins, Greg, JP, and Silviu letting them know
- Tritium Target Operator Training
- Note that this is different from the SAF110T - Tritium Training mentioned above
- Training consists of going through the slides HERE.
- Send an email to Meekins letting him know that you completed the training
Documentation
- LHRS Survey
- RHRS Survey
- Experiment seminar slides
- Run and online analysis slides
- Raster
- HRS DAQ Resources
- PortSever and CPU Programming
- Simulation
- Tel Aviv University SRC group
- [back to Hall A wiki]
Reference Reading
- Proposal for E12-14-011, approved by PAC-42
- Hall-A NIM paper (2004)
- Tech notes on HRS optics calibration
- Hall A Coordinate systems (Ye Zhihong PhD thesis)
- Tritium Target