(Created page with "*Subsystems update **HCal ***Jiwan working with detector, cosmics and LED, detector looks good, new wiki for HCAL ***Fast FADC configuration, to be tested, need to modify ana...") |
|||
Line 32: | Line 32: | ||
***magnetic field : measure with Hall probe and measure - look at GMn | ***magnetic field : measure with Hall probe and measure - look at GMn | ||
***VTP trigger for shower | ***VTP trigger for shower | ||
+ | |||
+ | *Update spreadsheet Dillon |
Latest revision as of 09:37, 29 June 2022
- Subsystems update
- HCal
- Jiwan working with detector, cosmics and LED, detector looks good, new wiki for HCAL
- Fast FADC configuration, to be tested, need to modify analysis
- side band still needs to be investigated
- Hodoscope
- HV scans with FADC
- everything looks ok
- HV crate update : waiting for the box to ship the new crate, old board should work in new crate, old crate might have radiation
- Beamline
- hardware working on improving uniformity of raster, reasonable shape but could do better
- want to do unser calibration , takes about 1 hour
- will use DAQ 10 AM EST for about one
- split for parity feedback - do we want to do unser calibration after the split ?
- Parity/helicity
- cables run next to the BCM and already plug on other side, will coordinate with David ( unser 4 KHz/uA as expected ) , can pull down by about 1%
- plan to run 30 Hz 500 us for GEn
- might be delayed for Hall B
- calibration of sign of asymmetry ? (Bogdan) - Usually come from Moller
- detector asymmetries ? event tagged with helicity
- GEM
- hardware work, SBS GEM frame on , need few more weeks before install, installation network and fibers ~ 2 weeks
- Bigbite GEM : new parallel HV installed, working, Sean will take cosmics, Nilanga coordinating EPICS controls for the new HV
- started put SBS crate on network, 2 VTP booted and 2 CPU, one device did not pick up correct IP address, still need to plug fiber for VTP
- eel124gemdaq will be installed in the hall so DAQ can be run
- Bryan putting together SBS and BB libraries together, programs for goal post and fish plots, can now be done from the VTP , information on wiki, working on resolving the differences between readout list
- Shower
- trigger working and set for cosmics data
- can modify and read threshold for bbcal high, need to implement for bbcal low, unplugged discrminator and given to Armen to modify to be able
- 14-2 PMT behaving weirdly, might replace the base, very unstable - same HV peak was 20 mV but week ago 80 mV now high unexplained difference
- check if PMT itself or electronic chain, check electronics and HV first
- magnetic field : measure with Hall probe and measure - look at GMn
- VTP trigger for shower
- HCal
- Update spreadsheet Dillon