* Hoping for end of April to install HV dividers on BB. | * Hoping for end of April to install HV dividers on BB. | ||
* [https://docs.google.com/spreadsheets/d/1QGkJZEgs3Uel5TfvR5iCwstGbNRv8rCM_hfFXXwRf2o/edit?usp=sharing BB APV status] | * [https://docs.google.com/spreadsheets/d/1QGkJZEgs3Uel5TfvR5iCwstGbNRv8rCM_hfFXXwRf2o/edit?usp=sharing BB APV status] | ||
+ | ** 10 APVs with missing strips. | ||
+ | ** ~400 strips missing (out of 30720) | ||
+ | ** Only 2 APVs near the center of the acceptance, about 60 strips. | ||
* Need 1 layer with HV divider upgrade for the SBS stack. | * Need 1 layer with HV divider upgrade for the SBS stack. | ||
* HV divider upgrade for INFN GEMs | * HV divider upgrade for INFN GEMs |
Revision as of 10:48, 2 March 2022
GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am
Link to all previous meetings: GMn GEM Commissioning Meeting
Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!
Contents
Near term work plan (all)
- Hoping for end of April to install HV dividers on BB.
- BB APV status
- 10 APVs with missing strips.
- ~400 strips missing (out of 30720)
- Only 2 APVs near the center of the acceptance, about 60 strips.
- Need 1 layer with HV divider upgrade for the SBS stack.
- HV divider upgrade for INFN GEMs
- Brad: update on date for install of SBS GEMs in Hall A.
- Need 2-3 months for APVs for 10th SBS layer.
- Need 1 week to install all dividers on BB GEMs and test.
Update on BB GEMs(Sean, Ezekiel, Holly, Anu)
- Negative tracking results - Sean
- Full plots in the HALOG, https://logbooks.jlab.org/entry/3986717
Update on UVa GEM layers for GEn-RP (Anu, John, Thir)
- APV inventory
Update on INFN GEM layers for GEn-RP (Ezekiel, Holly, Evaristo)
DAQ updates (Ben, Bryan, Alex)
- schematic of setup?
- FIR filter?