Difference between revisions of "Meeting 2022 09 14"
From Hall A Wiki
(→Near term work plan) |
(→Update on UVa GEM layers for GEn-RP) |
||
(7 intermediate revisions by 3 users not shown) | |||
Line 7: | Line 7: | ||
=== Near term work plan === | === Near term work plan === | ||
− | * | + | * see the GEM commissioning run plan for GEn-II here: [https://docs.google.com/spreadsheets/d/1ONOpMdQAgFz6FKP5G605jyuHiWJ1Sv1HHhwWhHg7GnI/edit#gid=0] |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* Thoughts on special run requests during GEn: | * Thoughts on special run requests during GEn: | ||
** Luminosity studies (Nilanga) | ** Luminosity studies (Nilanga) | ||
** Full readout studies for negative pulse studies and etc (Sean) | ** Full readout studies for negative pulse studies and etc (Sean) | ||
+ | ** HV efficiency scans with beam | ||
+ | |||
+ | === Update on BB GEMs === | ||
+ | * Cosmic data taken this week and GEMs remain stable. | ||
+ | * Ben investigating 3 ADC difference in CM calculation in the firmware. | ||
+ | * Cleaning up online monitoring for GEn | ||
=== Update on INFN GEM layers for GEn-RP === | === Update on INFN GEM layers for GEn-RP === | ||
− | * | + | * Issue with APVs in SBS setup. Running disabled at the moment to stabilize DAQ. |
− | + | ||
=== Update on UVa GEM layers for GEn-RP === | === Update on UVa GEM layers for GEn-RP === | ||
Line 33: | Line 27: | ||
* All layers/modules of SBS stack are operational and taking data. | * All layers/modules of SBS stack are operational and taking data. | ||
* Further latency adjustments improved hits and efficiencies | * Further latency adjustments improved hits and efficiencies | ||
+ | * Documentation update | ||
+ | * CAEN HV Module paper work | ||
+ | * Need to get an update on SBS gas system | ||
+ | * Repositioning the scintillators | ||
− | === | + | === Update monitoring with new GEMs in GEn-RP === |
+ | * Online monitoring and SBS-offline preparation for GEn-II | ||
=== DAQ updates (Ben, Bryan, Alex) === | === DAQ updates (Ben, Bryan, Alex) === | ||
+ | * SBS DAQ integration to GEn-II |
Latest revision as of 09:48, 14 September 2022
GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am
Link to all previous meetings: GMn GEM Commissioning Meeting
Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!
Contents
Near term work plan
- see the GEM commissioning run plan for GEn-II here: [1]
- Thoughts on special run requests during GEn:
- Luminosity studies (Nilanga)
- Full readout studies for negative pulse studies and etc (Sean)
- HV efficiency scans with beam
Update on BB GEMs
- Cosmic data taken this week and GEMs remain stable.
- Ben investigating 3 ADC difference in CM calculation in the firmware.
- Cleaning up online monitoring for GEn
Update on INFN GEM layers for GEn-RP
- Issue with APVs in SBS setup. Running disabled at the moment to stabilize DAQ.
Update on UVa GEM layers for GEn-RP
John:
- All layers/modules of SBS stack are operational and taking data.
- Further latency adjustments improved hits and efficiencies
- Documentation update
- CAEN HV Module paper work
- Need to get an update on SBS gas system
- Repositioning the scintillators
Update monitoring with new GEMs in GEn-RP
- Online monitoring and SBS-offline preparation for GEn-II
DAQ updates (Ben, Bryan, Alex)
- SBS DAQ integration to GEn-II