Difference between revisions of "Meeting solid coll 2017 layout and magnet"

From Hall A Wiki
Jump to: navigation, search
(information)
(information)
Line 16: Line 16:
 
** The minimum acceptance/maxium steel model "Solid_model_forces.pdf", the larger acceptance model of "SolidXL.pdf" and "SolidXL_2variations.pdf" and the variation building in an upstream neutron detector (upstream plug with steel and scintillator layers) all viable magnetically, as would be something intermediate. Mechanical and detector concerns will determine final configuration.
 
** The minimum acceptance/maxium steel model "Solid_model_forces.pdf", the larger acceptance model of "SolidXL.pdf" and "SolidXL_2variations.pdf" and the variation building in an upstream neutron detector (upstream plug with steel and scintillator layers) all viable magnetically, as would be something intermediate. Mechanical and detector concerns will determine final configuration.
 
** notes are here https://solid.jlab.org/cgi-bin/private/ShowDocument?docid=2 and https://solid.jlab.org/cgi-bin/private/ShowDocument?docid=6 (need to login with jlab account)
 
** notes are here https://solid.jlab.org/cgi-bin/private/ShowDocument?docid=2 and https://solid.jlab.org/cgi-bin/private/ShowDocument?docid=6 (need to login with jlab account)
 +
* space requirement and updated weight for ECal and SPD by Xiaochao: [http://hallaweb.jlab.org/12GeV/SoLID/meeting_coll/2017_02_layout_magnet/SoLID_EC_20170220.pdf PDF]

Revision as of 13:04, 20 February 2017

meeting info

information