Difference between revisions of "Monday, October 7, 2013 2:00pm EST"
From Hall A Wiki
(→Agenda) |
(→Agenda) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
# Update from KK/Tyler | # Update from KK/Tyler | ||
# Update from Juliette | # Update from Juliette | ||
− | ## | + | ## Spectrometer update at collaboration meeting [http://hallaweb.jlab.org/12GeV/Moller/downloads/Spectrometer_Update.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/Spectrometer_Update.pdf .pdf] |
## Spectrometer group update (overview - better field visualization) [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pdf .pdf] | ## Spectrometer group update (overview - better field visualization) [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pdf .pdf] | ||
− | # Update from Jason | + | ## MIT update (today) [http://hallaweb.jlab.org/12GeV/Moller/downloads/summary_of_plots_10-7-2013.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/summary_of_plots_10-7-2013.pdf .pdf] |
+ | # Update from Jason [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Carrier_Assy-BPC27.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Carrier_Assy-BPC27.pdf .pdf] | ||
+ | # Update from Jim [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Vacuum_Chamber_1.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Vacuum_Chamber_1.pdf .pdf] | ||
+ | # Update from Ernie | ||
== Minutes == | == Minutes == | ||
− | Attending: | + | Attending: Juliette, Tyler, KK, Jim, Jason, Ernie, Cathy |
+ | # Tyler/KK - had iteration with Jason | ||
+ | ## Tyler will make new pictures for Wednesday as backup | ||
+ | # Juliette | ||
+ | ## get somewhat similar optics back with iron, but with only 20% decrease in current density | ||
+ | # Jason - Carrier | ||
+ | ## went through iteration with Tyler | ||
+ | ## will probably need to trim acceptance to support coils | ||
+ | # Jim - Vacuum vessel | ||
+ | ## 9 tons | ||
+ | ## better with real vacuum attachments upstream and downstream | ||
+ | ## plan to cost the materials | ||
+ | ## plate is very large - mill run | ||
+ | ## petal pipe - having trouble getting supports in - will affect acceptance | ||
+ | ## if (iron free) SS - easier to weld, but not as strong, more weight | ||
+ | ## will investigate iron if we have to as a backup | ||
+ | ## need service ports and pumping ports | ||
+ | # Ernie | ||
+ | ## needs to know where the services go (talk to Juliette) | ||
+ | |||
+ | <br><br> For Wednesday (update - extensive though it is!): | ||
+ | <br> | ||
+ | # Juliette - no negative bend, iron in coils | ||
+ | # Jason - coil carrier FEA | ||
+ | # Jim - vacuum vessel FEA | ||
+ | |||
+ | <br><br> For Monday (more comprehensive): | ||
+ | <br> | ||
+ | # Times are internal and suggested only - looking at a 3 hour meeting... | ||
+ | ## KK - experiment overview (10 minutes + 10 minutes?) | ||
+ | ## Juliette - magnet overview (somewhat historical) (30 minutes + 15 minutes?) | ||
+ | ## Ernie - water-cooling and infrastructure (15 minutes + 15 minutes?) | ||
+ | ## Jason - Coil carrier and supports FEA (30 minutes + 15 minutes?) | ||
+ | ## Jim - Vacuum vessel FEA (15 minutes + 15 minutes?) | ||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 10:03, 9 October 2013
Last meeting: Tuesday, September 17, 2013 2:00pm EST
Agenda
- Update from KK/Tyler
- Update from Juliette
- Update from Jason .pptx .pdf
- Update from Jim .pptx .pdf
- Update from Ernie
Minutes
Attending: Juliette, Tyler, KK, Jim, Jason, Ernie, Cathy
- Tyler/KK - had iteration with Jason
- Tyler will make new pictures for Wednesday as backup
- Juliette
- get somewhat similar optics back with iron, but with only 20% decrease in current density
- Jason - Carrier
- went through iteration with Tyler
- will probably need to trim acceptance to support coils
- Jim - Vacuum vessel
- 9 tons
- better with real vacuum attachments upstream and downstream
- plan to cost the materials
- plate is very large - mill run
- petal pipe - having trouble getting supports in - will affect acceptance
- if (iron free) SS - easier to weld, but not as strong, more weight
- will investigate iron if we have to as a backup
- need service ports and pumping ports
- Ernie
- needs to know where the services go (talk to Juliette)
For Wednesday (update - extensive though it is!):
- Juliette - no negative bend, iron in coils
- Jason - coil carrier FEA
- Jim - vacuum vessel FEA
For Monday (more comprehensive):
- Times are internal and suggested only - looking at a 3 hour meeting...
- KK - experiment overview (10 minutes + 10 minutes?)
- Juliette - magnet overview (somewhat historical) (30 minutes + 15 minutes?)
- Ernie - water-cooling and infrastructure (15 minutes + 15 minutes?)
- Jason - Coil carrier and supports FEA (30 minutes + 15 minutes?)
- Jim - Vacuum vessel FEA (15 minutes + 15 minutes?)
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005