Difference between revisions of "Monday, October 7, 2013 2:00pm EST"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(11 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
# Update from KK/Tyler
 
# Update from KK/Tyler
 
# Update from Juliette
 
# Update from Juliette
##  
+
## Spectrometer update at collaboration meeting [http://hallaweb.jlab.org/12GeV/Moller/downloads/Spectrometer_Update.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/Spectrometer_Update.pdf .pdf]
 
## Spectrometer group update (overview - better field visualization) [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pdf .pdf]
 
## Spectrometer group update (overview - better field visualization) [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/spectrometer_group_6-12-2013.pdf .pdf]
# Update from Jason
+
## MIT update (today) [http://hallaweb.jlab.org/12GeV/Moller/downloads/summary_of_plots_10-7-2013.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/summary_of_plots_10-7-2013.pdf .pdf]
 +
# Update from Jason [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Carrier_Assy-BPC27.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Carrier_Assy-BPC27.pdf .pdf]
 +
# Update from Jim [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Vacuum_Chamber_1.pptx .pptx] [http://hallaweb.jlab.org/12GeV/Moller/downloads/FEA_of_Vacuum_Chamber_1.pdf .pdf]
 +
# Update from Ernie
  
 
== Minutes ==
 
== Minutes ==
  
Attending:  
+
Attending: Juliette, Tyler, KK, Jim, Jason, Ernie, Cathy
  
 +
# Tyler/KK - had iteration with Jason
 +
## Tyler will make new pictures for Wednesday as backup
 +
# Juliette
 +
## get somewhat similar optics back with iron, but with only 20% decrease in current density
 +
# Jason - Carrier
 +
## went through iteration with Tyler
 +
## will probably need to trim acceptance to support coils
 +
# Jim - Vacuum vessel
 +
## 9 tons
 +
## better with real vacuum attachments upstream and downstream
 +
## plan to cost the materials
 +
## plate is very large - mill run
 +
## petal pipe - having trouble getting supports in - will affect acceptance
 +
## if (iron free) SS - easier to weld, but not as strong, more weight
 +
## will investigate iron if we have to as a backup
 +
## need service ports and pumping ports
 +
# Ernie
 +
## needs to know where the services go (talk to Juliette)
 +
 +
<br><br> For Wednesday (update - extensive though it is!):
 +
<br>
 +
# Juliette - no negative bend, iron in coils
 +
# Jason - coil carrier FEA
 +
# Jim - vacuum vessel FEA
 +
 +
<br><br> For Monday (more comprehensive):
 +
<br>
 +
# Times are internal and suggested only - looking at a 3 hour meeting...
 +
## KK - experiment overview (10 minutes + 10 minutes?)
 +
## Juliette - magnet overview (somewhat historical) (30 minutes + 15 minutes?)
 +
## Ernie - water-cooling and infrastructure (15 minutes + 15 minutes?)
 +
## Jason - Coil carrier and supports FEA (30 minutes + 15 minutes?)
 +
## Jim - Vacuum vessel FEA  (15 minutes + 15 minutes?)
  
 
<br><br> Return to [[Teleconferences]]
 
<br><br> Return to [[Teleconferences]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]

Latest revision as of 10:03, 9 October 2013

Last meeting: Tuesday, September 17, 2013 2:00pm EST

Agenda

  1. Update from KK/Tyler
  2. Update from Juliette
    1. Spectrometer update at collaboration meeting .pptx .pdf
    2. Spectrometer group update (overview - better field visualization) .pptx .pdf
    3. MIT update (today) .pptx .pdf
  3. Update from Jason .pptx .pdf
  4. Update from Jim .pptx .pdf
  5. Update from Ernie

Minutes

Attending: Juliette, Tyler, KK, Jim, Jason, Ernie, Cathy

  1. Tyler/KK - had iteration with Jason
    1. Tyler will make new pictures for Wednesday as backup
  2. Juliette
    1. get somewhat similar optics back with iron, but with only 20% decrease in current density
  3. Jason - Carrier
    1. went through iteration with Tyler
    2. will probably need to trim acceptance to support coils
  4. Jim - Vacuum vessel
    1. 9 tons
    2. better with real vacuum attachments upstream and downstream
    3. plan to cost the materials
    4. plate is very large - mill run
    5. petal pipe - having trouble getting supports in - will affect acceptance
    6. if (iron free) SS - easier to weld, but not as strong, more weight
    7. will investigate iron if we have to as a backup
    8. need service ports and pumping ports
  5. Ernie
    1. needs to know where the services go (talk to Juliette)



For Wednesday (update - extensive though it is!):

  1. Juliette - no negative bend, iron in coils
  2. Jason - coil carrier FEA
  3. Jim - vacuum vessel FEA



For Monday (more comprehensive):

  1. Times are internal and suggested only - looking at a 3 hour meeting...
    1. KK - experiment overview (10 minutes + 10 minutes?)
    2. Juliette - magnet overview (somewhat historical) (30 minutes + 15 minutes?)
    3. Ernie - water-cooling and infrastructure (15 minutes + 15 minutes?)
    4. Jason - Coil carrier and supports FEA (30 minutes + 15 minutes?)
    5. Jim - Vacuum vessel FEA (15 minutes + 15 minutes?)



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005