Difference between revisions of "Preparations-DOE2015-Nov-Review"
From Hall A Wiki
(→DOE 2015 review) |
|||
(23 intermediate revisions by 3 users not shown) | |||
Line 5: | Line 5: | ||
</ol> | </ol> | ||
===DOE 2015 review === | ===DOE 2015 review === | ||
− | * | + | * [https://hallaweb.jlab.org/wiki/images/d/da/SBS_Agenda_2015.pdf agenda]. |
* Initial Drafts due by October 21st for posting to wiki and overview by collaboration. | * Initial Drafts due by October 21st for posting to wiki and overview by collaboration. | ||
* Dry run talks ( on Nov 5th) from 8:30-2 in L102 ( Bluejeans :Meeting ID: 179417237 +1.888.240.2560(US Toll Free)) | * Dry run talks ( on Nov 5th) from 8:30-2 in L102 ( Bluejeans :Meeting ID: 179417237 +1.888.240.2560(US Toll Free)) | ||
+ | * Updated versions of talks: | ||
** 8:30-8:50 SBS Science Update and Overview [https://hallaweb.jlab.org/wiki/images/3/30/SBS_Science.pptx.pdf Talk] (Wojtsekhowski) | ** 8:30-8:50 SBS Science Update and Overview [https://hallaweb.jlab.org/wiki/images/3/30/SBS_Science.pptx.pdf Talk] (Wojtsekhowski) | ||
** 8:50-9:20 SBS Project: Cost, Schedule and Management [https://hallaweb.jlab.org/wiki/images/e/ef/SBS_management_Nov-2015.pdf Talk] (Jones) | ** 8:50-9:20 SBS Project: Cost, Schedule and Management [https://hallaweb.jlab.org/wiki/images/e/ef/SBS_management_Nov-2015.pdf Talk] (Jones) | ||
− | ** 9:20-9:40 Dependency overview (Keppel) | + | ** 9:20-9:40 Dependency overview [https://hallaweb.jlab.org/wiki/images/1/13/2015Review_Integration.pdf Talk] (Keppel) |
** 9:40-10:30 WBS 1 – SBS Basic: Magnet and Infrastructure [https://hallaweb.jlab.org/wiki/images/c/cb/SBS-Wines-Nov2015.pdf Talk] (Wines) | ** 9:40-10:30 WBS 1 – SBS Basic: Magnet and Infrastructure [https://hallaweb.jlab.org/wiki/images/c/cb/SBS-Wines-Nov2015.pdf Talk] (Wines) | ||
** 10:30- 11:10 WBS 2 – Neutron Form Factor: [https://hallaweb.jlab.org/wiki/images/9/96/CDet_DOE_Review_2015.pdf Talk] CDet (Khandaker) | ** 10:30- 11:10 WBS 2 – Neutron Form Factor: [https://hallaweb.jlab.org/wiki/images/9/96/CDet_DOE_Review_2015.pdf Talk] CDet (Khandaker) | ||
− | ** 11:10-11:50 Background MC – all experiments [ | + | ** 11:10-11:50 Background MC – all experiments [https://userweb.jlab.org/~riordan/riordan_mc_review2015.pdf Talk] (Riordan) |
− | ** 11:50-12:10 DAQ VME and Fastbus [https://hallaweb.jlab.org/wiki/images/ | + | ** 11:50-12:10 DAQ VME and Fastbus [https://hallaweb.jlab.org/wiki/images/0/0e/SuperBigBite_DAQ_update.pdf Talk] (Moffit) |
− | ** 12:10-12:30 WBS 3 – Proton Form Factor: GEM (Liyanage) | + | ** 12:10-12:30 WBS 3 – Proton Form Factor: GEM [https://hallaweb.jlab.org/wiki/images/1/16/Nov_2015_DOE_Review_GEM_NL.pdf Talk] (Liyanage) |
**Breakout: Dependencies ( for Dry Run we will NOT go through Dependency talks, but needed for Nov 9th to post for DOE reviewers) | **Breakout: Dependencies ( for Dry Run we will NOT go through Dependency talks, but needed for Nov 9th to post for DOE reviewers) | ||
− | ***Polarized 3He target (Cates) | + | ***Polarized 3He target [https://hallaweb.jlab.org/wiki/images/e/e4/Target_talk_v4.pdf talk] (Cates) |
− | *** HCal ( Franklin) | + | *** HCal [https://hallaweb.jlab.org/wiki/images/e/e8/HCALJ_Status_Nov_2015.pdf Talk]( Franklin) |
− | ***ECal (Riordan) | + | ***ECal [https://userweb.jlab.org/~riordan/riordan_ecal_review2015.pdf pdf] (Riordan) |
− | ***GRINCH (Averett) | + | ***GRINCH [https://hallaweb.jlab.org/wiki/images/c/c4/SBS_GRINCH_DOE_review_2015.pdf talk] (Averett) |
* Nov 9th post plenary and breakout session talks for DOE reviewers. | * Nov 9th post plenary and breakout session talks for DOE reviewers. | ||
+ | * [https://www.jlab.org/indico/conferenceDisplay.py?ovw=True&confId=115 Indico page ] for the Nov 16 and 17th review. | ||
* Additional material for the DOE reviewers | * Additional material for the DOE reviewers | ||
− | **Updated PMP | + | **[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2015/11/sbs_pmp-new-cd-mkj-6-signed.pdf Updated PMP] |
− | **Monthly reports | + | **[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2015/11/report_on_ecal_prototype_test.pdf Report] on the thermal annealing test of prototype calorimeter. |
− | **Recommendations tracker | + | **[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports] |
+ | **[https://hallaweb.jlab.org/wiki/images/a/a9/Response_to_DOE_2014_November_SBS_Review.pdf Recommendations tracker] | ||
**Background calculations for electronic hut. | **Background calculations for electronic hut. |
Latest revision as of 16:24, 15 November 2015
Response to DOE 2014 review report
- Final report from DOE Nov 2014 SBS review.
- DOE Nov 2014 recommendations with responses. Initial response to the recommendations and comments.
DOE 2015 review
- agenda.
- Initial Drafts due by October 21st for posting to wiki and overview by collaboration.
- Dry run talks ( on Nov 5th) from 8:30-2 in L102 ( Bluejeans :Meeting ID: 179417237 +1.888.240.2560(US Toll Free))
- Updated versions of talks:
- 8:30-8:50 SBS Science Update and Overview Talk (Wojtsekhowski)
- 8:50-9:20 SBS Project: Cost, Schedule and Management Talk (Jones)
- 9:20-9:40 Dependency overview Talk (Keppel)
- 9:40-10:30 WBS 1 – SBS Basic: Magnet and Infrastructure Talk (Wines)
- 10:30- 11:10 WBS 2 – Neutron Form Factor: Talk CDet (Khandaker)
- 11:10-11:50 Background MC – all experiments Talk (Riordan)
- 11:50-12:10 DAQ VME and Fastbus Talk (Moffit)
- 12:10-12:30 WBS 3 – Proton Form Factor: GEM Talk (Liyanage)
- Breakout: Dependencies ( for Dry Run we will NOT go through Dependency talks, but needed for Nov 9th to post for DOE reviewers)
- Nov 9th post plenary and breakout session talks for DOE reviewers.
- Indico page for the Nov 16 and 17th review.
- Additional material for the DOE reviewers
- Updated PMP
- Report on the thermal annealing test of prototype calorimeter.
- Monthly reports
- Recommendations tracker
- Background calculations for electronic hut.